Products Center
More Products

The first day of full resumption of work, yuchai full capacity to protect output

July 06, 2020

Yuchai green power city of China

On February 10, yuchai group fully resumed work. Yulin party secretary huang haikun, mayor wei tao came to yuchai, on-site inspection and guidance of yuchai after the resumption of the epidemic prevention and control work.


Yuchai group chairman yan ping to huang haikun (front row center) after the resumption of yuchai epidemic prevention and control work.


Wei tao (front row, middle) went to the workshop to inspect and guide the outbreak prevention and control work of the company after the resumption of work.

Since the outbreak, yuchai has earnestly implemented the relevant deployment and requirements of the CPC central committee, the state council and local governments at all levels for the prevention and control of the epidemic, strictly implemented the notice of the western region on delaying the resumption of business operations, actively adopted a series of epidemic prevention and control measures, and assisted the society to combat the epidemic in various ways. A day before the resumption of work, yan ping also presided over a video conference, the resumption of work after the outbreak prevention and control and production and management of the two major work carried out a comprehensive deployment.

Huang haigun and wei tao affirmed the prevention and control measures adopted by yuchai and the implementation of the prevention and control work, requiring yuchai to resolutely implement the prevention and control measures, resolutely stop the import and export of the epidemic, prevent the spread of the epidemic in the enterprise, effectively protect the life safety and health of employees, and ensure the stable development of the company's operation.

Yuchai solid measures to fight the epidemic and protect production:

◆ 11 special teams were set up to coordinate the resumption of work and the prevention and control of the epidemic from the aspects of key population investigation and control, material support, and control of the resumption of work plan;

◆ strictly control the entrance and exit of the factory and office areas. All personnel shall undergo temperature test and wear masks during the whole process;

◆ kill and prevent epidemic in office, production workshop, canteen, dormitory, elevator, toilet and other places comprehensively, kill and prevent epidemic regularly every day during work, and make real-time records;

◆ strengthen the staff canteen health management, implement the separate dining system, staff wrong peak dining;

◆ lay out the production plan after resumption in advance and coordinate with the upstream and downstream of the industrial chain;

◆ on the basis of epidemic prevention work, full power and full load production guarantee order delivery.

10 o 'clock in the morning of February 10, the first batch of high-horsepower ship electric engines on the first day of resumption of work will soon be offline.

On that day, yuchai production workshop machinery roar, site disinfection, parts transport, mechanical arm crane work orderly spread out, a hot scene. The returning workers are actively engaged in the production boom, fighting for precious time for the on-line assembly of engines. In order to meet the needs of customers and deliver the products as soon as possible, yuchai has been actively promoting the supply of spare parts before the resumption of work, and formulated a thorough and scientific production schedule.

Yuchai builders operate robots to assemble connecting rods.

& other; Before the Spring Festival, yuchai engine market demand is very hot, orders pour in. The outbreak of the disease has put pressure on the output of our yuchai and suppliers. Since the start of the Spring Festival, all sectors and departments have rapidly entered a state of intense work, fully resuming production and operation, maintaining output at full speed, and working hard to achieve the annual targets, so as to win the battle of epidemic prevention and control and production and operation. Throughout the &; "Yan ping stressed.

Featured

more

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China