April 18, 2024
April 2022,The largest electric Tractor project in Hunan Province landed in Loudi,55 JiangshanEV550 undertakes customer to cold steel、Lianyuan Steel、Henggang、Coke in Jiangrun Freight Yard、Washed coal transportation task。Nearly 2 years of operation,The total mileage of these Vehicles has exceeded 7.97 million kilometers.,Building a green logistics demonstration area has injected a source of power.。

Basic overview
Eliminate Vehicles:All the front four and rear eight fuel Trucks 40.
Fleet size:55 SANY Electric Heavy Truck JiangshanEV550
Procurement time:The first batch of 15 sets in April 2022+Repurchase of 40 units in July
Vehicle model :350kWh Power 、423kWh Power
Power consumption per kilometer:1.2-1.5 degrees
Full-time driver:57
Charging pile:12

In the eyes of the customer,It is a very correct decision for the company to fire the first shot of green development in Hunan Province.。According to the data of the company's cost estimation group,Nearly 2 years of operation,The power consumption per kilometer of Sany electric Tractor is maintained at 1.2-1.5 degrees,Compare the fuel Tractor,Power cost saves at least 1 yuan per kilometer,Creating 7.97 million direct economic benefits!
On December 12th, Asian Construction Equipment Group Co., Ltd. (abbreviated as ACE Group) Xuchang Production Base hosted a delegation of senior clients from The Republic of Tajikistan for an in-depth facility inspection. Guided by the warm winter sun, th
Despite the biting cold of early January, the spirit of international cooperation remained warm and vibrant. On January 5, 2026, three clients from Cameroon traveled thousands of miles to Henan, China, arriving with high expectations for a visit to Asian
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China