Products Center
More Products

Fangyuan Stabilized Soil Mixing Station Participates in Construction of Yidu Highway Project

March 31, 2023

Recently,Environmental Protection Technology Co., Ltd. to Yidu, HubeiWBZ600DCompletion of installation of secondary mixing and Stabilized Soil Mixing Station,It will soon be put into Yidu CitySConstruction of 254 Highway Ring Section Project。

S254 Yidu Ring Section Project starts from Gaobazhou and nowS254 intersect vertically,Across Provincial Highway 424(Plan)、After the Qingjiang River, it crosses Liu Gaolu at the same level.,Cross Yuyang River,Level crossing with Luyu First-class Road,Proceed along the existing and planned roads to the end of the project,Level crossing with existing Yihua Grade I Road,The total length of the route is 13.133km,Constructed according to the standard of two-way four-lane first-class highway。

This project has been incorporated into the 14th Five-Year Plan for Comprehensive Transportation Development of Hubei Province.(Highway and waterway)Key project library,Its construction will improve the regional road network structure.、Promote the rapid development of cities and towns、Alleviate regional traffic pressure、Improve the service level of provincial roads、Promote the economic integration development of Yijingjing metropolitan area、It is of great significance to enhance regional comprehensive competitiveness.。

Wang Xinjun and Wang Jianlei
 

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China