September 01, 2022
It is suddenly late in the world.,Mountains and rivers are already autumn.
Mixing strategy,No matter in summer or autumn
The road to wealth is not just all the way forward.,Stop regularly for maintenance,Increasing the service life of the mixer Truck is another way to get rich.。

Small screw,Don't despise.
For the mixer Truck used for a long time, the screws of the reducer base and the auxiliary beam connectors shall be checked regularly.,In order to avoid damage to the Vehicle caused by the loss of screws。
Overloading is strictly prohibited
The maximum quantity of concrete carried shall not exceed the maximum volume of the tank,Because of the different strength grades of concrete,Its density is also different.,High-strength concrete is also generally dense.,The same volume,Too much is not good for the car.。
Replace the pipeline sealing gasket in advance
Rubber products are easy to accelerate aging in high temperature environment.,However, the working environment of the concrete mixer is relatively poor.。Therefore, check the pipeline in advance.,Replace the sealing washer,Avoid oil leakage、Oil leakage and other faults。
When replacing the hydraulic oil,Replace the hydraulic filter element
Many card friends know to change hydraulic oil with the season.,Here, Xiaobian reminds you:The filter element must also be replaced together.。
Confirm the function of radiator
The role of the mixer radiator is very important.,Therefore, be sure to check in advance whether the radiator can automatically open when the hydraulic oil is high temperature.,Avoid causing high temperature of hydraulic oil。

The above maintenance strategy,You!GetDid you?
Although it is autumn.,But the heat is not over.
Card friends in attendance should also pay attention to cooling and heatstroke prevention.
On December 12th, Asian Construction Equipment Group Co., Ltd. (abbreviated as ACE Group) Xuchang Production Base hosted a delegation of senior clients from The Republic of Tajikistan for an in-depth facility inspection. Guided by the warm winter sun, th
Despite the biting cold of early January, the spirit of international cooperation remained warm and vibrant. On January 5, 2026, three clients from Cameroon traveled thousands of miles to Henan, China, arriving with high expectations for a visit to Asian
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China