Products Center
More Products

Ship out, cart out! Sany international welcomes a good start

September 05, 2020

With the outbreak of the new coronary pneumonia gradually under control, the number of new confirmed cases showed a downward trend, and sany international returned to full operation, epidemic protection and supply work entered a new stage.

the production line is also the epidemic prevention line

{_7 }

Under the guidance of the group's emergency leading group for epidemic prevention, sany heavy equipment through thorough deployment, scientific formulation of plans, to achieve accurate enterprise resumption of work, effectively achieve epidemic prevention, resumption of work with both hands, to accelerate the resumption of Mining Machinery and equipment production, quality and supply.

As of February 26, sany has reinstalled 1,313 employees, with a recovery rate of 88% and a recovery rate of 98% for key posts, fully ensuring the normal operation and efficient production of the enterprise.

On the assembly line of sany reassembly plant no. 6, busy three people tightly grasp the production, orderly operation, efficient operation, in order to fully meet the production needs and efforts.

During the epidemic, international orders in engineering manufacturing continued to rise, and key domestic projects were started one after another, with the demand gradually rising.

Sany heavy equipment scientific scheduling, efficient resumption of work, give full play to the strong support of the national economy, play an important role in the prevention and control of the epidemic.

sany Marine 12 RTG delivered

Recently, sany Marine engineering also ushered in the resumption of the climax, epidemic protection entered a new stage, the enterprise to return to the track of efficient operation.

& have spent & have spent

Every morning at 6 o 'clock, the day just broke, the cleaners began to the dormitory building, the canteen, the office building, the workshop … & hellip; Sterilize inside and out, and repeat every four hours. Employees chuckle that the smell of spring this year belongs to them. Throughout 84 &; .

The work in the workshop should also be kept more than 1.5 meters apart, sometimes a person a station. We each perform their own duties, production is orderly and intense.

In order to eliminate the staff to return to work concerns, peace of mind to return to work, every employee into the park need to pass the nucleic acid test negative to work. The test results need to be isolated in the dormitory building.

Land traffic is blocked, but sea transport is still smooth. Sany Marine's 500T gate seat will carry 6 RTG cranes on board and send them to zhuhai international container terminal. It is reported that during the outbreak, sany Marine engineering sent a total of 12 RTG.

Epidemic prevention is not slackened, the resumption of work is not delayed. Believe that winter to spring, after the emergence of all things, must be full of vitality, busy and prosperous scene.

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China