April 23, 2024
Evening of April 20, 2024,On the Embedded Medium and Low Speed Maglev Comprehensive Test Line of Chengdu Xinjin Puxing Industrial Park,Sichuan Development Maglev Technology Co., Ltd.'s Three-group embedded medium and low speed maglev train has completed 180km/hSpeed test。Tested and witnessed by the third party qualification testing unit,The maximum speed of the train is 181.km/h,The speed record 169 in the field of medium and low speed maglev traffic created by the maglev train has been refreshed again.km/h。At 19:00 on April 20, 2024,The test team started the speed test of the maglev train according to the scheduled plan.,First through the maglev train 80km/hAnd 130km/hThe operation of the speed level verifies the line position corresponding to the maximum speed of the train and prepares for the speed test.。
Line position for maximum speed operation of built-in maglev train
20:23,The embedded maglev train starts from the end of the maglev comprehensive test line.,For the first time, the highest speed was 177.km/hRecord;Optimized operation parameters of test group,At 20:49, the embedded maglev train started to accelerate again from the end of the line.,Tested by the third party qualification testing unit,The embedded maglev train has created a maximum speed of 181 in the field of medium and low speed maglev transportation.km/hThe world record!
Embedded medium and low speed maglev train 180km/hPhotos of the scene
Embedded medium and low speed maglev train 180km/hStage speed test is successful,It has once again refreshed the world record of speed in the field of medium and low speed maglev transportation.。This also marks a step up in the performance and technology of embedded maglev products.,It can cover a wider range of rail transit application scenarios,Meet the needs of higher speed grades。
December 11, 2024,Dongfeng Commercial Vehicle 2025 Annual Partner Conference Held in Chengdu。Based on the final season of 2024,Dongfeng Commercial Vehicle joins hands with more than 600 dealers nationwide、There are more than 1000 representatives of mor
December eleventh,With“WE ARE ONE——A family、One heart、Work together、It's going to work”The 2025 Global Supply Chain Strategic Partnership Conference of China Heavy Truck Group was held in Shandong International Convention a
The other day,Final judgment of the People's Court of Changsha County, Hunan Province,It was found that Anbaituo Trading Co., Ltd. had caused damage to the commercial reputation of Sunward Intelligence.,Its behavior constitutes unfair competition.
December 2,Beijing Party Branch of International Corporation and Construction Machinery Party Branch of China Construction Machinery Corporation、The General Party Branch of China has launched“Forging New Productive Forces and Promoting New Indust
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China