Products Center
More Products

Beijing's key project construction plan for 2024 was released, and 12 subways will be built this year.

February 18, 2024

Beijing Key Project Construction Plan Released in 2024,Construction of 12 subways this year Capital Network Police 2024-02-02 16:36 Beijing

Recently,Beijing Key Project Construction Plan Released in 2024,Will continue to play“Three 100s”Brand Effect and Demonstration Leading Role of Municipal Key Projects,Among them, 100 infrastructure projects cover 12 metro projects.。Among,Wangjing South Station will be added to the Capital Airport Line this year。

The relevant person in charge of the Municipal Development and Reform Commission introduced,100 major infrastructure projects are planned to invest 57.1 billion yuan in that year.,Will build a modern infrastructure system,Promoting the construction of high-quality livable cities;Insist on integration and linkage,Continue to increase the intensity of investment in transport infrastructure;Accelerate the construction of green and low-carbon infrastructure,Strengthening energy security in key functional areas;Better coordination of development and security,Strengthening Infrastructure Construction in Resilient Cities;Promote the construction of new infrastructure,Speed up the digital transformation and intelligent upgrading of traditional infrastructure。

Railway engineering

Railway engineering,This year will beNew Suburban Railway Yizhuang Line Project,Continuation projects include:Beijing Tunnel Section of Beijing-Tangshan Intercity Railway、Intercity railway connecting line(Phase I)、Beijing Railway Connecting Line Lifting Project、Suburban Railway Urban Sub-central Line Integral Lifting Project(Section from Beijing West to Liangxiang)、Suburban railwaySLine 6(TTerminal 3-Daxing New Town Section)。

Urban Rail Transit

Of the 12 urban rail transit,IncludeTwo new projects of Wangjing South Station were added to the branch line of Line 1 and the Capital Airport Line.;10 continuation projectsThe first phase of Line 3、Line 12、Remaining Section of South Extension Phase I of Changping Line、Remaining section of Line 17、Line 22(Pinggu line)、Line 28(CBDLine)、Capacity expansion and upgrading of Line 13、North extension of the new airport line、MLine 101 Phase I、Phase II of Line 6(South extension)。

Schematic Diagram of Metro Line 12(The name of the station is subject to the actual completion.)Before,Connecting the city and the Capital AirportThe Capital Airport Line extends westward by one stop to Beixinqiao Station.。This year,This line willAdd Wangjing South Station,Transfer with Metro Line 14。In this way,Passengers going to the Capital Airport will have a new transfer route.。

Road traffic

In addition,The city strengthens multi-network integration this year.,Promote the integration and development of stations and cities,Optimize the functional layout of the surrounding areas of the hub,Arrange 9 station-city integrated transport hub projects。NewJingmi Expressway(Airport South Line-Sixth Ring Road)、Laibao Road New Line Expressway、108 New Line Expressway and other highways,Continuation of East Sixth Ring Road Widening(Into the ground) Reform 、Reconstruction and expansion of Jingping Expressway、Chengping Expressway(Beijing section)Wait for the highway。

The 17 urban roads include:New Liangmahe North Road、Shayang Road, etc;Continue to build Beiqing Road Rapid Reconstruction、Reconstruction and expansion of Tongma Road、Jingmi Expressway、Rapid reconstruction of Anli Road, etc.。

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China