ECONOMIZERWhat is it

Compaction 

Little assistant

Whether at the construction site、Road construction or channel engineering,High density foundation is essential。 Must Avoid under- or over-compaction。Ensure optimum soil compaction。

Through BMWECONOMIZERSoil compaction quality can be measured continuously throughout the compaction process。The system can identify areas that have been optimally compacted as well as locations where compaction is weak。The current compaction progress can be viewed at any time by the roller driver or the plate tamper operator,So you know exactly when, where and what to do.。

Through BMWECONOMIZER Reduce the number of passes by up to 25%。Minimize the work of soil compaction。The entire construction siteProductivity is not compromised

ECONOMIZERApplication of Matlab in Pavement Compaction

ECONOMIZERValue of

More intuitive

By lighting upLED The number of lights indicates an increase in compaction to the machine operator。When the display lights up LED When the number of lamps is no longer increased,The best compaction quality has been achieved。It is important to avoid unnecessary compaction:This avoids the risk of over-compaction。Comes with ECONOMIZER Rollers or plate Compactors can improve compaction quality while saving time and cost。

The operation is simple and convenient

The system does not require calibration or activation。After starting the engine,After the machine starts to vibrate,The system is ready to use。With the help of LED Number of lights on,The machine operator can immediately see when to stop compacting the subsoil。Red LED Warning lights indicate when there is a danger of over-compaction——Before the tamper plate or steel wheel bounces。

Save cost and reduce consumption

The system makes both possible:Optimum soil compaction and minimum effort。Only know when the best compaction quality is achieved,In order to decide when to end the compaction operation。Try to avoid unnecessary rolling times.。Through ECONOMIZER Reduce the number of passes by up to 25%。This saves valuable time.,Reduced fuel consumption and machine wear。

Take an example:For depth 2 mLength 500 m Construction of ditches,Compaction work is expected to take approximately 24 hours.。The construction must be completed within this time.。According to the material spread,How to achieve optimum compaction earlier,Complete compaction earlier than the normal 8 to 10 passes。UseECONOMIZER,Real-time detection of compaction effect,In our experiments,,Operation time can be reduced by up to 8 hours here。

Improve efficiency

In cases where the soil cannot be further compacted by repeated rolling(For example when the water content is too high),Machine operators can see this right away, too.:Light up LED The number of lamps is no longer increasing。Soft spots in the soil can also be detected early during the compaction process。So,Such defects can be eliminated in advance at a significantly lower cost。

Featured

more

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China