August 21, 2023
● Lin TaigeCC3000DStandard containerized concrete Batching Plant for PolandSAbout 250,000 cubic meters of concrete were delivered for the 14-kilometer section of the 7 Expressway Project.。
● This model has a standard container design.,The maximum production capacity is 240 cubic meters/Hour,Quick disassembly and assembly,The operation is stable。
According to statistics,One fifth of the highways in Poland use concrete pavement technology.,Lin TaigeCC3000DContainerized concrete Batching Plants are supporting key high-speed projects in Poland。
SMotorway 7 is a trans-European transport network within the Baltic-Adriatic corridor (TEN-T) An important part of。The total length of the highway is 720 kilometers.,Stretching south from the Baltic coast to the Slovak border,As a key transport project of the European Union,After completion, it will better connect the capital of Poland with the peripheral areas.。
The road is also EU.EPart of the International Highway,From Pskov, Russia to Budapest, Hungary,On the way, it connects many important economic cities.。
CC3000DThe standard container-type Concrete Mixing Plant is constructed in the section from Mrawa to Napierki.,This will be the longest highway ever built in Poland.。Most of these sections will be built by upgrading the existing State Highway 7.(DK 7)To build,The number of lanes will be doubled,And build the supporting hub facilities.,Uch as an interchange、Bridges, etc。
As a well-known European infrastructure group,STRABAGA subconTractor,TRANS-AMThe company finally chose Lin Taige.CC3000D As the core equipment for the construction of the expressway section。Lin Tai Ge enjoys in Europe“Perfect combination of moving and stirring”A good reputation,AndTRANS-AMIt is also the full play.CC3000DPrecise, homogeneous and efficient performance,Successfully completed the 14 km section between Napieki and Pvosk。
The highway section is located 130 kilometers north of Warsaw.,Connecting the two core cities of Mazowiecki province,Including 3.5 meters dual carriageway、2.5m emergency road and 0.75m soft shoulder,They are located on both sides of the 12-meter central isolation belt.。Lin TaigeCC3000DFinally, a total of 250,000 cubic meters of concrete will be produced for this section.。
LINTEC & LINNHOFFRegional Sales Manager Eastern EuropeMr. Przemek
LINTEC & LINNHOFFGroup Sales Manager Eastern EuropeMr.PrzemekExpress:“Since 1990,The client has been focusing on the construction of concrete roads.,Have rich project experience,The requirements for equipment are very strict。CC3000DAdopt double metering and double stirring design,It has 24-hour uninterrupted production capacity.;The summer heat meant that the concrete had to be produced and laid at night,The construction progress in autumn will be delayed due to the rainy season.;So like Lin TaigeCC3000DThis high productivity、Equipment with a high safety factor is essential.。”
— Lin TaigeCC3000DThe whole Concrete Mixing Plant adopts standard container design.:Convenient transportation,Quick disassembly and assembly。
— Double metering and double mixing modules can be produced independently.,The reliability of equipment operation is greatly enhanced.。
— The core part of the whole machine is integrated in the standard container.,It has the performance of environmental protection and severe weather resistance.,Increases component life and stability。
The total length of this section is 71 kilometers.,The cost is about 4.500 million euros,More than half of this is financed by the EU Solidarity Fund.,The aim is to improve the connectivity of European countries,Eliminate traffic bottlenecks,Promotion of trade and tourism。
Except for the 25 km stretch from Krakow to the south,The wholeS7 The project is scheduled for completion in 2026。
Collated according to customs data,In October 2024, China's import and export trade volume of construction machinery was 48.$4.1 billion,Year-on-year growth of 24.2%。Among:Imports 2.$3.3 billion,Year-on-year growth of 33.1%;Exports 46.$0.8 billion
Guangxi Cummins,Zan 8 Review of past issues
November 20,Party Secretary of Shandong Heavy Industry Group、Chairman Man Shengang Meets with ZF Group Board Members、Peter, Head of Commercial Vehicle Solutions and Industrial Technology·Lyle,The two sides exchanged views on further deepening st
November twenty sixth-The 29th, bauma CHINA 2024 Yingxuan Heavy Industry Booth W5.511 Look forward to your visit. Witness the glory of construction machinery industry with us! ▌Plea
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China