July 03, 2023
Focus on large-tonnage hoisting boss,When choosing equipment, the eye is often more unique.:Not only the performance should be strong,It has to be efficient.、Low fault、Good operation。According to brother Chong's observation,These“Both want and want.”Requirements of,I'm afraid onlySAC8000C7-8 like this“All-round fighter”To be satisfied。This model has a better performance of the same level of products.,You can easily fill up all aspects of the ability value in a straight line.。
Combat power explodes
Easily cover a variety of conditions
SAC8000C7-8 Fully extended main boom 91m,Jib 48/66m,Wind power jib 10-58m,Counterweight 183t。
Working condition of main boom:28.4mMain arm,10mMagnitude,Can be hoisted 197.9t;50mMain arm,20mMagnitude,Can lift 105t;91mFull reach,20mMagnitude,Can be hoisted by 45.3t。Full coverage of 500-Working condition of main boom with super-lift for 600-ton product,Meet the bridge、Shield hoisting requirements。Working condition of main boom super-lift:39.5mArm length,10mMagnitude,203 can be hoisted.2t;50.6mMain arm,20mMagnitude,Can lift 108.2t;91mFull reach,14mMagnitude,92 can be hoistedt。Jib working condition:144.1mArm length,30mMagnitude,Can lift 23.3t;Longest arm length 150m,30mMagnitude,Can lift 21t;The longest arm of tower arm under working condition exceeds 160m,Meet the needs of aerial work。Wind power working condition:Satisfy 3.0MWWind power maintenance and 130mHoisting of mixed tower drum;91mLong main arm+Short wind arm(10-16m),Overhaul 1.5-2.0MWThe fan is fast and efficient。
The chassis is solid
Flexible movement to control the whole court
2400-ton heavy-duty Vehicle axle of the same class,Plus 505 big tires and 7 axle chassis,Load capacity increased by 50%,Heavy-duty transition is effortless。
Transfer with arm and outrigger,Vehicle speed 50km/h,3 hours saved per 100 km;With arm, outrigger and super-lift transition,Vehicle speed 20km/h,7% savings per 100 km.5 hours。
SAC8000C7-8 Short body,Length of complete vehicle with arm is no more than 21m,With ultra-lifting over 4.5mThe culvert has no pressure。Don't hurt the car、No detours,One step ahead of others.,This is the advantage.。
Operation is worry-free
Saving more than money
SAC8000C7-8 There are three span combinations(50%/75%/100%)、Three radius of gyration(9.2m/8.1m/7.1m),The site is highly adaptable.。Counterweight deflection up to 2m,Under the same working condition, 30 can be reduced.tCounterweight,Reduce one flatbed Truck for transportation。Purchase of flatbed only、Operating expenses,Millions can be saved in 10 years.。
In addition,Of this device.Jib、Tower arm、Counterweight and so on can be used with some old models.,This wave of operation comes down.,It's not just money that is saved.,There is also the cost of less worry, less coordination and less effort.,Kill many birds with one stone。
Strong fighting power、Homework is fast、Easy to operate,SAC8000C7-8 shows“All-round fighter”Due high standard。If you also want to win a place in the high-level hoisting,,Let it bless you.,Direct possession of crushing power。
October 15, 2024-The 17th,The 6th Micro Excavation Conference and Small Equipment Conference will be held in Daqin Hot Spring Hotel, Xi'an, Shaanxi Province!This is the sixth time that the construction machinery industry has ushered in such high s
Afternoon in Yunnan,Master Xue is devoting himself to the tense and orderly loading operation.。Unlike other truckers,,Xue Shifu frequently travels between the mainland and several Sino-Burmese border ports in Yunnan.。In his opinion,Only in vehicle main
Recently Celebrating the 75th Anniversary of the People's Republic of ChinaXCMG has dozens of sets“Sophisticated”Emergency rescue equipmentSet out for all parts of the motherland to take practical actions to comprehensively improv
September 30,“Win-win cooperation·Climb the peak again”——XCMG 500 new energy lightCardDelivery of Shunfeng Group Batch Departure Ceremony Held in Xugong High-end Intelligent Commercial Vehicle Production Base。 In resp
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China