Products Center
More Products

3 hours → 30 minutes | Weichai Power Behind the Acceleration of China's Infrastructure

January 31, 2023

Gaolan River Bridge of Yixing Railway, Yichang City, Hubei Provinc

With the successful capping of Pier 13 with a height of 124 meters,

It marks new progress in the construction of the whole line of Yixing Railway.

This is the first pier of the high-speed railway currently under construction in China.

Behind its efficient construction

It is inseparable from a large number of carriers.

Weichai engine、Weichai Linde Hydraulic Power Assembly

Construction equipment working day and night

  

△The No.13 pier of Gaolan River Bridge on Yixing Railway with a pier height of 124 meters was successfully capped.

3 hours→30 minutes Run out of China's new speed

  

△The construction of Yixing Railway started in 2021.,It is expected to open to traffic in August 2025.。At that time,30 minutes from Xingshan to Yichang。At present, it takes at least 3 hours to drive.,It will greatly facilitate the travel of local people.。

  

The whole section of Yixing Railway has complex topography and landform.,The terrain is undulating。Because the rock mass is strongly compressed by the structure,,High hardness of tunnel rock、The construction is difficult。Carry Weichai in large quantitiesWP10HLoader for the engine,And carryWP4.6NEngine+Linde Hydraulic Powertrain'sFR215EExcavators and other equipment go all out to attack,Helping China's new railway speed。

No fear of harsh working conditions Efficient and fuel-efficient

  

Weichai supporting loaderWP10HEngine

1260N·mHigh Torque,Explosive force is strong

Start fast,The acceleration is fierce,10% more efficient%Above

Weichai is independentECU+Fuel injector+High efficiency supercharger

Meet the fourth national emission of non-road

Complete machine rack and“Three high”Test totals more than 20000 hour

Stronger、More economical、More environmentally friendly

  

Hydraulic power assembly of Weichai Excavator

Engine+Hydraulic+Coordinated calibration of control strategy of the whole machine

Quick response,Precise control,Achieve more stable output speed

Engine、Linde hydraulic、Three-party collaborative development and matching of complete machine

And has high efficiency and reliability、Economical and fuel-efficient、Comfortable operation and the like

Advantages of Intelligent Construction Scheme for Power Integration

At a faster speed、Better products to serve customers

Accelerating China's Infrastructure Construction

Featured

more

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China