November 16, 2022
Winter has come,When you add clothes, don't forget to check and maintain our loader in time.,Learn the following points together with Xiaobian.!
The first point:Maintenance of fuel circuit
● Select the fuel correctly
Diesel should be selected according to the local temperature and the cold filter plugging point and condensation point of diesel.。
● Maintain the fuel circuit
(1)Replace the fuel filter according to the maintenance interval.;
(2)Thoroughly clean the water separator,Timely discharge of impurities and water,Replace those that cannot be thoroughly cleaned;
(3)Clean the diesel tank regularly,Remove the sediment from the bottom.;
The second point:Selection of engine oil
Should be based on local temperatures,Select the appropriate engine oil according to the viscosity of the engine oil。
The third point:Choose high-quality antifreeze
●Two indicators to measure antifreeze
One is the freezing point,Ordinary antifreeze can reach—40℃,High-quality antifreeze can achieve—60℃Left and right;The second is the boiling point,Antifreeze should have a boiling point of at least 108℃(Pass positiveRegulate the channel,Purchase regular original products)。
● Consideration of anti-corrosion and anti-rust performance
Anti-corrosion and anti-rust performance directly affects the service life of engine cooling system。Secondly, anti-scaling should be considered.,Scale and rust seriously affect the cooling function of the cooling system.,Therefore, before replacing the antifreeze, it is better to clean up the scale and rust spots in the radiator before adding new antifreeze.。
● Replacement frequency of antifreeze
Antifreeze is recommended to be replaced every 2 years.,Different types of antifreeze must not be mixed.,In order to avoid chemical reaction、Precipitation or bubble generation。
The fourth point:Water pump inspection
Some equipment has oil emulsification after replacing antifreeze.,The reason may be due to the aging and failure of the water seal of the pump.,The antifreeze enters the engine oil passage through the water seal and reaches the engine oil pan, resulting in the emulsification of engine oil.。Therefore, closely observe the engine oil level after replacing the antifreeze.,The oil level is found to be high,The machine shall be shut down for inspection,The method of replacing the water pump seal or the water pump assembly is generally adopted.。
After repair, the machine shall be operated at idle speed with no load,Use the new engine oil to remove the residual antifreeze in the engine lubrication system.,Notice:Shorten the interval for the next oil Chan,O as to ensure the normal functioning of the engine lubrication system.。
The fifth point:Maintenance of three leakages of equipment
Thermal expansion and cold contraction phenomenon in the hydraulic system、Air Path、Seals for waterways,Pecially rubberOType Ring、More obvious on seals such as rectangular ring,The temperature stays below 0.℃Time,The machine will leak oil.、Air leak、Water leakage,In particular, the temperature continues to approach.-10℃Time。Therefore, before the equipment enters winter, it is necessary to carry out a comprehensive overhaul of the three leakages of the whole machine.,Eliminate three leakages and hidden troubles。
Point 6:Overhaul electrical equipment
In winter, the aging equipment is often difficult to start.,So,Checking and replacing aging electrical circuits and components during seasonal maintenance is an essential measure to reduce start-up difficulties.,The battery should also be thoroughly checked and maintained。
Warm air equipment is essential for outdoor work in winter.,Therefore, the operation of the heating equipment should be checked before the severe winter.。
China Forestry Machinery Pioneer It has 17 years of research and development of forestry machinery、Manufacturing experience Guangxi Xuwo Engineering Machinery Co., Ltd. Will be on November 26.-29 Shanghai BMW showE4-579 Wonderful appear
November thirteenth,Accompanied by Vice General Manager Li Yongjie, the delegation of Zhongke Xinji Engineering Technology Co., Ltd. visited Fangyuan Group.。 Guests go deep into the production line of Fangyuan Group,Observe the production
Danasen is the world leader in hydraulic power conversion equipment,You are invited to attend from November 26 to 29, 2024,Held at Shanghai New International Expo Center BAUMA CHINA (Shanghai BMW Construction Machinery Exhibition)。 This exhibi
November thirteenth,Chairman-in-Office of Sany Group、President Tang Xiuguo led the team to Kunming, Yunnan,Visit to Yunnan Jiantou Group,Secretary of the Party Committee of the Group、Chairman Chen Zujun and his delegation held a discussion.。The two sid
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China