November 01, 2022
Zhonggong Network News(Worker's Daily-Zhonggong.com reporter Du Xin)Recently issued by the Ministry of Transport《Notice on Further Accelerating the Examination and Approval of the Design of National Key Highway Construction Projects》(Hereinafter referred to as《Notice》)Put forward,Relevant units shall strengthen design management according to,And that design quality is improve;Optimize the workflow,Expedite technical review;Strengthen dispatching coordination,Timely handling of approval and other requirements,Improve work efficiency and design quality,Promote the project to start as soon as possible,Bring investment benefits into full play as soon as possible。
According to《Notice》,For the recent inclusion in the list of national policy-oriented financial instruments,、Projects to be commenced within a specified time limit,The feasibility study has not been approved, but the scheme is basically determined.、The design is basically completed.,The Ministry of Transport may organize design review or investigation in advance in conjunction with provincial transport authorities.。Provincial transportation authorities should strengthen their links with other relevant departments.。
《Notice》Clear,The Ministry of Transport, together with provincial transport authorities, will strengthen project scheduling.,To urge relevant units to strengthen cohesion。For different projects in the same province,Or similar projects in neighboring provinces,The progress of preliminary work is basically the same.,Centralized review,Improve efficiency。
《Notice》Request,For projects supported by national policy financial instruments and other special emergency projects,,Organize consulting units as appropriate、Project units and design units work together,Reach an agreement as soon as possible,Ensure the quality of design and consultation,Complete design revision and consultation report。
【Source:China Economic Net】
A steel mill in Liaoning,Shan TuiSE370EVElectric excavator with its excellent performance and stable performance,Working for more than 10,000 hours in the harsh environment of high temperature and dust,Become the most dazzling star。 Excellent
Ningxia Yiha Logistics was established in August 2013.,It's been 11 years now.,From owning the first Shandeka to growing into a million riders of Shandeka,Wang yuan, the general manager, is the witness of the development along the way.。 Wang y
“Private Board of Directors of Construction Machinery Aftermarket”Scene 4“Construction machinery aftermarket(Guangdong)Private board of directors”It was officially held in the conference room of Guangzhou Juhe Construction Machi
“Big head”“It saves money”“The key is also good-looking” I heard there are mines.“Tall, rich and handsome”Here we go? Xugong Mine“Big Mac”Those who have used it all say yes.!“Hig
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China