October 31, 2022
No.2 Construction Machinery Plant meets the recent centralized delivery demand of finished machine production units.,Deeply promote the contracting of external processing business。October nineteenth in the afternoon,Undertook the processing task of a thin-walled connector of Jiutian Xingge Aerospace Company.,The accuracy requirement is high,It is difficult to control the deformation of workpieces。
The No.2 Construction Machinery Plant has worked out the best processing scheme in combination with the existing conditions.,Make reasonable tooling,In the shortest possible time, high standards and high quality of the work to the hands of users.,Meet the needs of users。
Over the years,No.2 Construction Machinery Plant contracted through external processing business,It not only deepens foreign cooperation,At the same time, it has accumulated experience in processing high-precision workpieces.,And that proces level is improved.。
No.2 Construction Machinery Factory
Dong Junguo
On December 12th, Asian Construction Equipment Group Co., Ltd. (abbreviated as ACE Group) Xuchang Production Base hosted a delegation of senior clients from The Republic of Tajikistan for an in-depth facility inspection. Guided by the warm winter sun, th
Despite the biting cold of early January, the spirit of international cooperation remained warm and vibrant. On January 5, 2026, three clients from Cameroon traveled thousands of miles to Henan, China, arriving with high expectations for a visit to Asian
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China