September 21, 2022
September 17,Liuzhou-Wuzhou Section of the New Liuzhou-Guangzhou Railway Invested by Guangxi Transportation Investment Group(Short name“Liuwu Railway”)Full construction of the whole line。
Project Roadmap
Liuwu Railway is located in Guizhong, Guangxi.、Eastern Guangxi area。The line starts from Jinde Station of Hunan-Guangxi Railway.,Via Liuzhou、Guest、Guigang、4 cities and 8 counties in Wuzhou(District),Connect with Wuzhou Station of Yizhan Railway。Jinde Station is set on the whole line.、Chuanshan station、Xiangzhou station、Wuxuan station、Dongxiang station、Guiping North Station、Pingnanbei Station、Tengxian North Station、Wangwu station、There are 10 stations in Wuzhou Station.,Among them, Jinde Station、Wuzhou Station is an existing station,Chuanshan station、Wangwu Station is an overtaking station,The remaining stations are intermediate stations.。Total length of main line of the project: 237.78 kilometers,The ratio of bridge to tunnel is 72.33%,For the national railwayⅠLevel、Double line electrification、Mixed passenger and freight railway,Target design speed 160 km/Time,Total budget estimate approved for the project 336.0.7 billion yuan,Approve the total construction period(Including joint commissioning and test)4 years。
Construction site of the first section of Liuzhou-Wuzhou Railway Project
Entrance of Zijingyaoshan Tunnel, the longest tunnel in Liuwu Railway Project
Liuzhou-Wuzhou Railway is an important part of Liuzhou-Guangzhou Railway.,Liuzhou-Guangzhou Railway is a national railway.“Fourteen five”Plan《Outline》Identified major engineering projects,For the country《Medium and long term railway network planning》An Important Ordinary Speed Railway Passage from Central and Southwest China to the Pearl River Delta,It is the main channel for freight exchange between most areas of Sichuan, Chongqing, Yunnan and Guizhou and central Guangxi and Guangdong-Hong Kong-Macao Greater Bay Area.,It is an important part of the regional comprehensive three-dimensional transportation network.,It is a regional trunk railway with both passenger and freight traffic.。After completion, it can ease the tension of the capacity of the national railway regional network.,The transportation distance can be shortened.、And that transportation cost is reduce,To improve the regional railway transportation network,Speed up the construction of cross-regional railway transport corridor,It is of great significance and role to better integrate Guangxi and the Middle East into the Guangdong-Hong Kong-Macao Greater Bay Area.。(Reporter Xiong Zongtao correspondent Li Wengang)
China Forestry Machinery Pioneer It has 17 years of research and development of forestry machinery、Manufacturing experience Guangxi Xuwo Engineering Machinery Co., Ltd. Will be on November 26.-29 Shanghai BMW showE4-579 Wonderful appear
November thirteenth,Accompanied by Vice General Manager Li Yongjie, the delegation of Zhongke Xinji Engineering Technology Co., Ltd. visited Fangyuan Group.。 Guests go deep into the production line of Fangyuan Group,Observe the production
Danasen is the world leader in hydraulic power conversion equipment,You are invited to attend from November 26 to 29, 2024,Held at Shanghai New International Expo Center BAUMA CHINA (Shanghai BMW Construction Machinery Exhibition)。 This exhibi
November thirteenth,Chairman-in-Office of Sany Group、President Tang Xiuguo led the team to Kunming, Yunnan,Visit to Yunnan Jiantou Group,Secretary of the Party Committee of the Group、Chairman Chen Zujun and his delegation held a discussion.。The two sid
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China