Investors of franchise project of Zhengzhou-Xinxiang section of Zhengzhou-Huixian expressway.
Project overview
This bidding project has been listed in the expressway network planning of Henan Province.(2021-2035)The newly added expressway from Zhengzhou to Huixian。The starting point of Zhengzhou-Huixian expressway from Zhengzhou to Xinxiang is located in Daguai Town, Fengquan District, Xinxiang.,Intersection with Hebao Expressway,Connect Xinjin Expressway to the north,The route runs southward through the east of Hehe Town, Xinxiang County.、West of Dazhaoying town、East of Taishan Township, Huojia County、Kangcun Town West、West of Zhulou Township, Plain Urban-Rural Integration Demonstration Area、East of Zhandian Town, Wuzhi County, Jiaozuo,In the west of Qiaobei Township, it crosses the north embankment of the Yellow River and enters the boundary of Huiji District of Zhengzhou.,After crossing the south embankment of the Yellow River,To the south, Tianhe Road is used for viaduct.,End point and Dahe Road(North Fourth Ring Road)The elevated floors are connected。It passes through Fengquan District of Xinxiang City.、Makino district、Xinxiang County、Huojia County、Demonstration area of urban-rural integration in plain、Wuzhi County, Jiaozuo City、Huiji District, Zhengzhou City。(The details are subject to the approval.)
(5)Construction scale and technical standard:
The construction mileage of Zhengzhou-Xinxiang section of Zhengzhou-Huixian expressway is about 58.878 kilometers,About 53 in Xinxiang.Seven kilometers,About 0 in Jiaozuo.5 kilometers,About 4 in Zhengzhou.678 kilometers。The main line toll station is set at Jiadi in this project.,The design speed to the north of the main line toll station is 120km/h,Four lanes in both directions,Standard width of subgrade 27m,The design speed in the south of the main line toll station is 100km/h,Eight lanes in both directions,Standard width of subgrade 41m。(The details are subject to the approval.)
(6)Construction period:The estimated construction period is 48 months.。(The details are subject to the approval.)
(7)Project investment estimation:The investment estimate for the Zhengzhou-Xinxiang section of the Zhengzhou-Huixian expressway is about 147.5.4 billion yuan,Of which about 122 in San Heung.2.1 billion yuan,About 23 in Zhengzhou.2.4 billion yuan,About 2 in Jiaozuo.0.9 billion yuan。(The details are subject to the approval.)
Bid winner
First place:Henan expressway Development Co., Ltd
Second place:Guangxi Road and Bridge Engineering Group Co., Ltd.
Third place:CCCC Road & Bridge Construction Co., Ltd
December 11, 2024,Dongfeng Commercial Vehicle 2025 Annual Partner Conference Held in Chengdu。Based on the final season of 2024,Dongfeng Commercial Vehicle joins hands with more than 600 dealers nationwide、There are more than 1000 representatives of mor
December eleventh,With“WE ARE ONE——A family、One heart、Work together、It's going to work”The 2025 Global Supply Chain Strategic Partnership Conference of China Heavy Truck Group was held in Shandong International Convention a
The other day,Final judgment of the People's Court of Changsha County, Hunan Province,It was found that Anbaituo Trading Co., Ltd. had caused damage to the commercial reputation of Sunward Intelligence.,Its behavior constitutes unfair competition.
December 2,Beijing Party Branch of International Corporation and Construction Machinery Party Branch of China Construction Machinery Corporation、The General Party Branch of China has launched“Forging New Productive Forces and Promoting New Indust
Copyright Notice 2002-2025 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China