Rutting is an important index in the periodical evaluation of asphalt pavement and pavement maintenance. Is there a low cost, high quality process, to help eradicate the ruts in the life of repair, save maintenance costs? Please see & other; Road doctor ” Through years of scientific research to bring everyone new “ Prescription & throughout; .
{ 1 background _2}
Deformation of asphalt pavement, especially rutting, is a special disease type of asphalt pavement, which is closely related to temperature sensitivity of asphalt materials.
Rutting damage
Deformation diseases are bound to occur in the life cycle of asphalt pavement, sooner or later, and have become asphalt pavement “ Cancer & throughout; And high temperature and heavy load traffic are the two main causes of accelerating the deformation of asphalt pavement. Road workers mainly use modified asphalt and optimized mixture gradation to improve the anti-deformation performance of asphalt pavement, but they only delay the time of deformation and have little effect on heavy load and above traffic. For sections prone to heavy rutting deformation, such as level crossings, uphill sections, BRT lanes, port roads, etc., maintenance year after year has exhausted the custodians.
For & other; Effect a radical cure & throughout; Asphalt pavement deformation diseases, “ Road doctor ” After many years of technical breakthrough, research and development of targeted “ The new prescription & throughout; & ndash; & ndash; Large gap grouting asphalt pavement technology, and successfully applied in ldquo; Clinical trials ” .
2 technology introduction
Large gap grouting asphalt pavement technology is in the flexible large gap asphalt mixture (void ratio of 20%~30%) into the special high-strength slurry, the formation of “ The combination of hardness and softness ” The large gap grouting pavement, with beautiful and comfortable asphalt pavement and strength stability of cement concrete pavement, fundamentally solves the problem of asphalt pavement deformation diseases.
Advantages over asphalt pavement are as follows:
(1) the rutting resistance is more than 5 times that of traditional high-performance asphalt, and the rutting depth within five years is less than 5mm (see the figure below);
(2) better water stability, residual stability and freeze-thaw splitting ratio both exceed 90%;
Compared with the advantages of cement pavement are as follows:
(1) good plate performance, no need to cut seam in the whole process, low driving noise, good comfort;
(2) good surface flatness, large structure and good anti-slip performance;
(3) after opening to traffic, the color of the pavement can be adjusted according to the needs. It can be a striking color or the same color as the surrounding asphalt pavement.
3 application scope
This technology is applicable to heavy load and above traffic load sections, level crossings, climbing sections, BRT dedicated lanes, toll stations, ports, airports and other special heavy load rutted sections.
4 grout characteristics
The grouting grout used in this technique is composed of “ Road doctor ” Independent research and development, with the following performance characteristics:
(1) the strength is rapidly formed, and only 2~3h of health maintenance is needed to open the traffic (the following figure shows the data of compressive strength at different health maintenance times);
(2) low consistency, good fluidity, no need for vibration, perfusion rate can reach above 98%;
during high strength slurry perfusion
(3) no bleeding, high surface strength and good durability;
(4) different colors can be prepared according to the needs, which can be applied to colored pavement.
Color large gap grouting pavement core section
5 application case
(1) background
Chaohu S105 hejie road bantang street section, heavy traffic, heavy Vehicles, multiple intersections appear rutting disease, local rutting depth of more than 10cm.
State of original road surface
(2) on-site coring
On-site coring found that there was no damage to the left and right wheel tracks and the base course in the middle of the lane, and the ruts were mainly caused by the deformation of asphalt layer. (see the following figure for the core sample)
Core diagram of different parts of single lane
(3) maintenance scheme
Mill 10cm asphalt layer (middle and upper layer) of the original road surface within the damage range, spray emulsified asphalt adhesive layer oil, and then lay 10cm large void modified asphalt mixture (20%~30% void ratio) back, and pour special grout after the temperature of the mixture drops to the ambient temperature. After 3 hours of health maintenance, open traffic.
Pavement structure chart after grouting
(4) construction process
The construction process is as follows (from left to right) :
(5) effect evaluation
After the health maintenance, the pavement was tested and evaluated. The surface structure depth exceeded 1mm, and the core sample test results showed that the perfusion rate reached 98.4%.
Track and observe the rut development trend as shown in the figure below. By comparison, it can be seen that the rut developed to nearly 6cm in 1 year of operation of ordinary asphalt pavement at heavy traffic intersection, while the large gap grouting asphalt pavement had almost no rut.
Rutting trend chart of large gap grouting road and ordinary road
Site diagram
after 1 year under different construction processes{ 6 summaries _2}
Large gap grouting asphalt pavement with asphalt pavement flatness, low noise and all the good performance, at the same time the “ New drugs & throughout; It also fundamentally solves the problem of deformation and disease of asphalt pavement, especially suitable for heavy and extra-heavy traffic sections such as level crossings, bus harbors, toll stations and airports. The & other; New drugs & throughout; It can solve the problem that the ordinary section, especially the special section, needs repeated maintenance due to deformation and diseases in the asphalt pavement design life cycle, save the maintenance cost in the whole life cycle, and provide an optional new ldquo for our road maintainers to deal with the road. Medicine & throughout; .
Sanyi Double Eleven Carnival Feast,The purchase of the machine can be reduced by 15 thousand yuan immediately.,Miss waiting for a year! Xiang yuan 11.4 Golden Egg Smashing Activity Superimposed Enjoyment,Up to 10,000 yuan discount prize waiting for
Jiangsu Taixin Machinery Co Ltd(Hereinafter referred to as“Taixin Machinery”)As the director unit of Piling Machinery Branch of China Construction Machinery Industry Association,Actively participated in the third and fourth member congresse
baumaCHINACountdown to 2024:23 days!New Quality Trinity· Enter the museum tomorrow→Create a low-carbon future together! Tomorrow,Sany Group is stationedbaumaCHINAPavilion 2024, Openbauma CHINA Construction of booth 2024。 Novembe
Guidance for extensive and in-depth development“Make contributions to the 14th and 15th National Congress、Strive for a new journey”Thematic Labor and Skills Competition,Vigorously carry forward the spirit of labor、Craftsman spirit,Prom
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China