June 24, 2020
On February 5, it was built by China construction no.7 engineering bureau and is called “ Henan xiaotangshan hospital ” The project of infectious disease hospital of zhengzhou first people's hospital began to be checked and accepted. The complex building passed the check and accepted and was delivered. The new ward was also checked and accepted on the same day.
As a designated hospital for the treatment of pneumonia patients infected by new coronavirus in zhengzhou, the infectious disease hospital of zhengzhou first people's hospital has a total construction area of 26,210 square meters, including the renovation of an existing outpatient building of more than 7,000 square meters and the construction of a new ward of 11,650 square meters, including about 800 beds for doctors and patients.
Complex building is the original outpatient service building renovation project, a total construction area of more than 7000 square meters, the original used in hospital outpatient department and emergency room occupancy, after transforming administrative office and the medical staff accommodation will be used in hospital logistics, including a fire control room, 2 meeting rooms, two restaurants, 30 offices, 57 between medical personnel residential buildings.
The newly built ward, which completed pre-acceptance on the same day, will mainly be used for the admission and treatment of pneumonia patients infected by the new coronavirus. Newly built ward area, outpatient area, medical technology area, a total of 285 beds, two operating rooms.
In addition, the hospital has set up three separate, smaller rooms for sample collection and testing because of isolation requirements. Operating room, ICU, CT room and test room are separated by medical channel. Receiving patients for examination, medical staff passing, ward inpatient into the medical technology building for review, ward inpatient into the medical technology building operating room rescue design for the independent flow line, to avoid overlapping, the isolation function to the extreme.
China Forestry Machinery Pioneer It has 17 years of research and development of forestry machinery、Manufacturing experience Guangxi Xuwo Engineering Machinery Co., Ltd. Will be on November 26.-29 Shanghai BMW showE4-579 Wonderful appear
November thirteenth,Accompanied by Vice General Manager Li Yongjie, the delegation of Zhongke Xinji Engineering Technology Co., Ltd. visited Fangyuan Group.。 Guests go deep into the production line of Fangyuan Group,Observe the production
Danasen is the world leader in hydraulic power conversion equipment,You are invited to attend from November 26 to 29, 2024,Held at Shanghai New International Expo Center BAUMA CHINA (Shanghai BMW Construction Machinery Exhibition)。 This exhibi
November thirteenth,Chairman-in-Office of Sany Group、President Tang Xiuguo led the team to Kunming, Yunnan,Visit to Yunnan Jiantou Group,Secretary of the Party Committee of the Group、Chairman Chen Zujun and his delegation held a discussion.。The two sid
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China