June 19, 2020
On the afternoon of February 4, the reporter visited and saw that the whole medical isolation area was distributed in the shape of fish bones. The medical technology building is in the form of steel structure, the lifting has been completed, the roof plate installation is coming to an end, three CT units have been installed in advance and are being adjusted.
The living area for medical workers includes 10 buildings, and the 7 medical dormitories located in the athletes' dining room have been completed. The main structure of the newly added 1 expert building and 2 logistics support buildings at the back has been completed and the interior decoration is under way.
Each room of Raytheon mountain hospital medical staff dormitory has three high and low beds, which can accommodate 6 people.
By the evening of April 4, 96.5% of the box room and ward hoisting had been completed, more than half of the road hardening had been completed, the foundation of supporting functional rooms such as liquid chlorine charging room, liquid oxygen station, positive and negative pressure station room, and temporary storage of polluted materials had been completed, the installation of sewage treatment station equipment and pipes had been completed, and the construction of waste incineration station had also been completed. 1,025 construction managers, 7,906 construction personnel, 1,491 Excavators, cranes and other mechanical equipment into the construction .
Thor is hill hospital after vulcan hill hospital, wuhan new mode of the second Beijing xiaotangshan special hospital, a total construction area of 79700 square meters, the whole reference field hospital form, adopt modular design, including health quarantine, staff living area, a comprehensive logistics area three partitions, a total of 1500 sickbeds, organized by wuhan real estate group construction, build three innings to construction general contracting way. Source | hubei daily
December 11, 2024,Dongfeng Commercial Vehicle 2025 Annual Partner Conference Held in Chengdu。Based on the final season of 2024,Dongfeng Commercial Vehicle joins hands with more than 600 dealers nationwide、There are more than 1000 representatives of mor
December eleventh,With“WE ARE ONE——A family、One heart、Work together、It's going to work”The 2025 Global Supply Chain Strategic Partnership Conference of China Heavy Truck Group was held in Shandong International Convention a
The other day,Final judgment of the People's Court of Changsha County, Hunan Province,It was found that Anbaituo Trading Co., Ltd. had caused damage to the commercial reputation of Sunward Intelligence.,Its behavior constitutes unfair competition.
December 2,Beijing Party Branch of International Corporation and Construction Machinery Party Branch of China Construction Machinery Corporation、The General Party Branch of China has launched“Forging New Productive Forces and Promoting New Indust
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China