Products Center
More Products

Wuhan "xiaotangshan" will be built in 6 days, because there are behind them!

June 04, 2020

What can you do in 6 days?
Can you believe
Can build a building area of 25,000 square meters within 6 days
A hospital with a capacity of 1000 beds!

& have spent

The plan is
Complete leveling terrain on the first day
The second day paved water steady
Day 4 new board house
Day 6 a brand new hospital

& have spent

This sounds like a myth
But underestimated the known as ldquo; Infrastructure mania “ Chinese speed

in Chinese hands Nothing is impossible

& have spent

In order to work efficiently in a short time
XCMG contacted China construction third engineering bureau immediately
Site assembly of joint dealers and customers
Up to 29, a total of 52 XCMG equipment operation
Among them, 10 xugong Excavators and 3 xugong rollers
28 XCMG cranes, 10 stirring Trucks
1 heavy Truck carrying materials


Every second must be used on the blade

throughout the construction period The project department works day and night on two shifts

& have spent

Digging machine dealer wang wei is

when the construction notice was received on New Year's eve, 24th Spring Festival gala just started, the New Year's eve dinner just served
After a moment's hesitation
It was raining that day
Wearing a thick mask
Stepping on the muddy ground
March into the construction site like a soldier

& other; XCMG group wuhan vulcan mountain hospital construction project site director wang wei: this time XCMG provided more than 30 equipment. From excavation to leveling, rolling, to hoisting, we are working against time, 24 hours a day and night in the tense construction, on the premise of ensuring quality, ensuring time, we pay our dedication to make positive contributions to the early completion of vulcan mountain hospital. Throughout the &;

& have spent

And more engineering robots
New Year's eve dinner is just a simple box lunch
No tables and chairs
So stand by
Squatting in the corner with a bowl to eat

Chinese valentine's day 520 heart-shaped dynamic dividing line

An ordinary person
Doing extraordinary things
There is no angel in white in this world
Armor warrior
Just a bunch of kids changing clothes
Learn from predecessors to save the country
Their uniform is their uniform
The hero's armor

Because in the face of disaster
Remember
You are more than just your own back
Behind you is us
Is the whole country

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China