June 02, 2020
On the night of January 23, the santui equipment and nearly a hundred other equipment were stationed at the construction site of caidian in wuhan. Wuhan xiaotangshan ” The construction of hospitals.
The first case was found in wuhan. Novel coronavirus ” , have been found in the whole country and infected more than 600 confirmed cases, with the development of the outbreak, wuhan municipal government decided to reference to Beijing's xiaotangshan model emergency hospital, in response to a complex situation, what might happen in the future, the hospital building area of 25000 square meters, can accommodate 1000 beds, the hospital will be built in six days.
According to the site environment, the equipment that shantui participated in the construction of the project is the super-wetland Bulldozer, which can quickly level off the soft and wet ground and gain valuable time for the subsequent erection work. Shantui will provide service and support for each equipment and ensure the efficient operation of the equipment.
On December 12th, Asian Construction Equipment Group Co., Ltd. (abbreviated as ACE Group) Xuchang Production Base hosted a delegation of senior clients from The Republic of Tajikistan for an in-depth facility inspection. Guided by the warm winter sun, th
Despite the biting cold of early January, the spirit of international cooperation remained warm and vibrant. On January 5, 2026, three clients from Cameroon traveled thousands of miles to Henan, China, arriving with high expectations for a visit to Asian
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China