Sany and the whole nation to fight against the hope of spring
A sudden outbreak has blocked the physical distance between people. Isolate virus, never isolate love, just 10 days, vulcan mountain hospital. Behind this is countless construction machinery industry practitioners, engineering
no winter can not pass there isn't a spring that doesn't come on the front line of outbreak are only respectable and lovely angels in white always stick to ironclad soldiers construction machinery industry common war “ Plague &
On the afternoon of February 4, reporter visited and saw that whole medical isolation area was distributed in shape fish bones. The technology building is form steel structure, lifting has been completed, roof plate installation
Guide language On the morning of February 4, at critical moment fighting against XCMG, wang min went to front line dispatch XCMG overseas employees collect epidemic prevention materials, and got know work life home abroad. Wang
In Luanhekou wind farm, a nacelle of wind turbine whose power reaches 3.8MW is carefully raised to match the 162-meter-high tower with the help of SCC8000A, the sought-after crawler crane of SANY. According to the plan for the second development phase of
Race against time, fighting the epidemic such as fire and water, engineering robots in front line, support first line of duty. Wuhan affects hearts countless people, vulcan mountain, Raytheon mountain hospital can not be built without
Reporter from the contractor in construction of third bureau learned that by noon February 3, wuhan Raytheon mountain hospital overall completed 80%. The isolation ward is responsible for 75% total workload. Among them, all
Since the outbreak of epidemic, hunan xingbang intelligent equipment co., LTD. (hereinafter referred to as xingbang) has followed instructions local government and made decisions arrangements, actively fulfilled responsibility
epidemic is command, field battlefield hand over 1 minute in advance stop the spread of disease one earlier (wuhan vulcan mountain construction) After wuhan smooth electricity, we race against time, steady and orderly,
After the construction of wuhan vulcan mountain hospital by guoji luojian roller on January 26, series again charge in fight “ Novel coronavirus ” A line. February 2, luoyang edition Vulcan & throughout; Hospital
Skyjack, a subsidiary of linamar group, expanded its presence in east Asia with the opening new 21,527-square-foot (2,000-square-meter) plant outside Seoul, South Korea. The industry leader has been conducting sales activities
February 3rd, is the National Day. Fight disease & throughout; A historical moment, wuhan vulcan mountain hospital began to use. In 10 days, a 1,000-bed was built, miracle in history of world construction. More than 4000 builders,
On the morning of February 2, 2020, wuhan vulcan mountain hospital, which can accommodate more than 1,000 beds and has a construction area nearly five football fields, was successfully delivered after 10 days heavy fighting.
all war epidemic, lynx in action! A sudden disease, affecting the hearts of hundreds millions people. After 9 days heavy fighting, Chinese engineers have completed a race against time! February 2, “ Vulcan mountain &
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China