August 07, 2024
“Star of Jiangxia”The project is located in the south of Bafen Mountain, Jiangxia District, Wuhan.,The maximum structure height is 139 meters.,After completion, it will become the business card of Guanggu Nanda Health Industrial Park.、Talent incubation base,Form Jiangxia Big Health Industrial Park with Industrial Development、Business services、New landmarks led by cultural and leisure functions。
The project has a large volume.,The structure is complex,The overall steel consumption is more than ten thousand tons.。Among,Exhibition hall on the third floor“Phoenix Nest”Jianghan Tower Crane supported by roof and steel ribbon works efficiently in this project.,Steady progress has been made in the safeguard project.。
Engineer Liu, JianghanJHT7527B-20 Tower Crane、Two products of energy efficiency Construction Elevator perform together,With its excellent performance, it has overcome the construction difficulties.、The construction period is tight、Heavy tasks and other difficult problems,Brilliant in project construction。
JHT7527 Tower Crane Energy Efficiency Construction Elevator Efficient Operation
Liugong Jianghan Star ProductsJHT7527B-20,Independent height 61.0m,End lifting capacity 2.70t,Maximum lifting torque 356t·m,On a large scalePCArchitecture、Bridge、Steel structure building、Widely used in venues and other fields,Since entering the construction site,Precise hoisting every time,Each full load run,All reflect the strength of Jianghan products.。
Liugong Jianghan Energy Efficiency Construction Lift,Energy saving up to 50% compared with traditional frequency conversion elevator%,High efficiency and high energy,It provides a strong guarantee for the project construction to speed up and increase efficiency.。
Distribution energy feedback system and high-efficiency driving mechanism,50% energy saving compared to conventional lift%;
No resistance box configuration,Eliminate the hidden danger of heat source,Integrated control system,The wiring is simple,The quality is more stable;
SupportPWMHigh frequency rectification design,Input harmonic content is less than 5%;
Open-loop zero servo control,Ensure the safety of drivers and passengers;
Main bearing material of lightweight suspension cage,Use of high-strength steel to increase payload capacity。
-Invitation- Sincere invitation After four years of precipitation November twenty sixth-The 29th bauma CHINA 2024 Shanghai International Construction Machinery、Building materials machinery、Mining Machinery、Construction Vehicles and
Recently,Batch departure of XCMG insulated bucket arm truck,The total value exceeded 50 million,It marks an important step in the wide application of this type of equipment in the power industry.。All the time,XCMG insulated bucket arm truck relies on i
The other day,For the in-depth implementation of preferential enterprise services,Make sure“Entrepreneur Week”The activities have achieved tangible results,Leading Group of Wuqing District Government Goes Deep into the Front Line of Enterpr
It,How many secret weapons are hidden??
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China