September 06, 2024

Liugong Equipment Helps Duku Highway Emergency Rescue
09:50, September 5,GLine 217K587-K671(Exit of Bayingou-Hashilegen Tunnel)Road section, Because K663 avalanches,Two-way traffic control is implemented in this section.。

The rescue team of the local highway management department immediately arrived at the avalanche point.,Organize and carry out road rush work,And open a temporary passage.,Evacuate stranded Vehicles。Liugong loader efficiently cleans up sand and stones at the first time、Snow, etc,Help to clear and open the temporary passage。

As at 12:30 on 5 September,Snow on the north side of Haxilegen Daban on Duku Highway、The sand and stones have been cleared.,The conditions for opening to traffic have been met,Yili Traffic Police to Duku Highway Joelma、Temporary traffic control has been lifted at the entrance of Nalati section.,The whole line was reopened to traffic。
AI Translation Notice: This article was translated from Chinese into English using AI-assisted translation. Original source: http://news.lmjx.net/2024/202409/2024090616013449.shtml. The translation may contain errors, and the original Chinese source should be referred to for accuracy.
ACE Group Invites You to the 140th Canton Fair As golden breezes bring crisp autumn air and the fragrance of osmanthus drifts through the air, the 140th China Import and Export Fair (Canton Fair, Autumn Session) arrives as scheduled. Known as "Chi
ACE Group successfully concluded its three-stop September exhibition tour: Mining Indonesia (Jakarta), MiningWeek & MinePro 2026 (Ulaanbaatar) and Paving Expo (São Paulo), showcasing mobile crushing stations, BAP200+RAP80 asphalt plants and mining excavat
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China