Products Center
More Products

Yuchai Rotary Drilling Rig Construction Changtai River-Crossing Connection Line Project

September 01, 2023

The geological conditions of the viaduct project are complex.,Near the Yangtze River,And the construction period is tight,The geology is yellow sand silt layer.,There is also a silt layer、Clay layer,The water table is high,It is easy to collapse,Pile hole diameter 1m,Single hole depth 40-70 meters。Yuchai rotary excavation relies on efficient and fast construction speed and mature construction scheme.,Help customers reduce operating costs,Time for forming single hole is about 2-3 hours。After several days of construction, YuchaiYCRThe excellent performance of 280 Rotary Drilling Rig in high efficiency and fuel saving has been highly recognized by customers.。

YuchaiYCRPerformance characteristics of 280 high-performance Rotary Drilling Rig

●Full set of imported brand Rexroth hydraulic system,And that construction efficiency is high、And that performance is stable;

●Three-input power head,Power head gear setting,Adapt according to different working conditions,Efficient and fuel-efficient;

●New Large Braking Torque Slewing Reducer Makes Equipment Construction More Stable;

●Newly developed WeChat applet,It can monitor the working status and construction progress of the machine in real time.,Make it easier for customers to focus on their devices。

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China