April 17, 2023
April does not lose the spring.,Delivery is a busy time,A beautiful day is destined to start with the delivery.,The motorcade entered the factory one after another.,Open the shipping mode!Do your best to make every order.,Every Shipment,It's all about trust and recognition.。




A few days ago, the person in charge of delivery put the equipment parts to be delivered in the delivery area.,For the convenience of delivery.,So as not to delay the delivery time.,It can be seen that we have made full preparations for this delivery.,Every order is made on trust.,The deal is small,Trust is big,Every piece of equipment is foolproof from drawing to production.,In order to live up to the trust of every customer.。
AI Translation Notice: This article was translated from Chinese into English using AI-assisted translation. Original source: http://news.lmjx.net/2023/202304/2023041716463591.shtml. The translation may contain errors, and the original Chinese source should be referred to for accuracy.
ACE Group Invites You to the 140th Canton Fair As golden breezes bring crisp autumn air and the fragrance of osmanthus drifts through the air, the 140th China Import and Export Fair (Canton Fair, Autumn Session) arrives as scheduled. Known as "Chi
ACE Group successfully concluded its three-stop September exhibition tour: Mining Indonesia (Jakarta), MiningWeek & MinePro 2026 (Ulaanbaatar) and Paving Expo (São Paulo), showcasing mobile crushing stations, BAP200+RAP80 asphalt plants and mining excavat
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China