March 24, 2023

March 23,Experts from the National Center for Safety Signs of Mining Products came to the group company to conduct on-site evaluation of safety signs of mining products.。

Review basis《Factory Quality Assurance Capability Requirements》And the special requirements for factory review of the corresponding products.,Mainly from production、Technology、Quality inspection、Review of technical data in four aspects of procurement。

On-site verification and data review by evaluation experts,It is considered that the quality management system of the product is sound and operates normally.,Production equipment、The inspection instrument is complete and meets the production requirements,Technical force to meet production needs,Skilled operation of inspection personnel,Have the ability to produce Concrete Pump products for coal mine,Successfully passed the audit。
On December 12th, Asian Construction Equipment Group Co., Ltd. (abbreviated as ACE Group) Xuchang Production Base hosted a delegation of senior clients from The Republic of Tajikistan for an in-depth facility inspection. Guided by the warm winter sun, th
Despite the biting cold of early January, the spirit of international cooperation remained warm and vibrant. On January 5, 2026, three clients from Cameroon traveled thousands of miles to Henan, China, arriving with high expectations for a visit to Asian
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China