Products Center
More Products

Xinzhu: It is the right time to set sail and forge ahead, to spring and to the future.

March 24, 2023

Spring comes and the world flourishes again.。

In the beautiful spring.,Everything revives、Baicao Huiya,Vibrant。In the spring season of possibility.,All departments of Xinzhu Zhizhuang、The unit is taking action.、Use hard work,To spring、Strive for the future,To create infinite possibilities.。

Product testingProduct testing

Before the product leaves the factory,Will undergo strict quality testing.,Need to pass no less than24Hour detection test,The detection process reaches10Coclass,To ensure product quality。

Product commissioningProduct commissioning

The staff are operating and debugging the product.,The running test and calibration time shall not be less than3Hour,So that the customer can easily use the equipment after receiving it.。

 

Prepare goods for shipmentPreparation and shipment

From the beginning of the year to now,Product orders are full,Among them, the mixing station products have received orders.More than 10Set,Workshop workers are working overtime every day to catch up with orders.,Products are also being shipped.。(According to statistics,All kinds of equipment sent to the Sichuan-Tibet Railway Project, a national key project, have reachedMore than 60 sets)。

Equipment is subject to inspectionEquipment welcome for inspection

Leaders of the State Railway Group Visited and Inspected the No.5 Horizontal Tunnel of Yigong Tunnel of CCCC Second Highway Engineering Co., Ltd. in the Fifth Bid of Tibet Section of Sichuan-Tibet Railway,Xinzhu Zhizhuang2An anchor bolt trolley,3A wet spraying trolley,2The mixing station is being inspected。

Equipment return visitequipment

After-sales department、Under the leadership of General Manager Li, the personnel of the technical department and the manufacturing department went to Shudao Group to undertake the construction.4Project Base Xixiang Expressway、Huilu Expressway、Expressway along the Yangtze River、Xining Expressway pays a return visit to the equipment。The customer is satisfied、Creating value for our customers has always been our philosophy.。

Business developmentBusiness Development

Salesmen rush to the average altitude with the spirit of lack of oxygen and faith.4500 metersA snowy plateau,In order to expand the business without stopping.。

Project siteProject site

Equipment shipped to major projects:Arch frame installation trolley、Anchor rod installation trolley、Concrete wet spraying trolleys and so on are struggling to complete their“Mission”。

 

After-sales serviceafter-sale service

After-sales personnel are making preparations before the launch。Our after-sales service involves30+Market,Adhere to timely and efficient service,The spirit of creating the greatest value for customers,24Hours on standby,15Minute response,4Hours to arrive at the scene of the mission.,Provide comprehensive services to customers。

The spring tide is surging,Agitate a myriad of weather。

Look at the trend from the beginning,Look at the whole year from the beginning of the year,The spirit of new construction of smart clothing to fight、A real drive,Work together as one,Roll up your sleeves and work harder.“Weather”,Running at full speed in 2023“Runway”Go,Strive to achieve performance goals in an all-round way。

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China