August 26, 2020
Service diary, February 25
Outbreaks continue, relevant state ministries and commissions and local government introduced a series of supporting enterprises, project to return to work and production, policy measures to promote the economic and stable operation, is also gradually restore construction of highway engineering construction industry, major projects have been started, who has road just holding group equipment (group), I wish you all good luck in the old and new users start!
Customer service center during the outbreak of service uninterrupted, through a number of service measures to assist users to participate in the anti-epidemic project construction, in order to understand the upcoming resumption of user equipment use and actual demand, through the E, wisdom & throughout; All customer service engineers are online 24 hours a day to answer calls and reply messages at any time, providing timely and effective services for overseas and domestic users, especially for participating in the construction of each region. Xiaotangshan & throughout; Users of hospitals and major highway construction projects provide support and security.
At the same time, after-sales team also many times video work meeting, summarize all around for a long time in ten years after-sales service line of actual combat experience, creating multiple devices common faults and maintenance technical guidance and a short video, through constant communication with customers, we are delighted to hear and see more and more users have been or will be on the road to return to work, here, to just road just holding group equipment (group) customer service center for partners on a return to work first boot check tips.
Synchronous sealing car
01
1. Check engine oil, gear oil and antifreeze for leakage or lack.
2. Check the steering oil and brake fluid for leakage or lack.
3. Check and grease the transmission part of the Vehicle.
4. Check whether the connecting bolt of the whole owner's auxiliary beam is loose.
5. Check whether the battery of the car has lost power, and the polarity of the main power cord must be correct; Please consult dagon customer service before connecting the main power cord.
6. Check for leakage or lack of hydraulic oil and thermal oil.
7. Check whether the gear oil of the force exTractor is lacking.
8. Check the asphalt pump, lifting mechanism, material door, and stone spreading system for filling butter.
Add heat conducting oil to stirring bearing.
10. Clean the carbon accumulation of Burner; Clean diesel filters and nozzles.
11. Check whether the cabinet wiring is loose after inspection.
12. After starting the Vehicle, turn on the main power supply and check whether the thermal oil heating system works normally. Check whether the thermal oil temperature, asphalt temperature and pipe temperature are displayed normally; Check whether the asphalt pump and the roller can be opened manually; Check whether the spraying tube folds, lifts and lifts, and whether the inner hopper lifts and lifts normally; Check whether the speed, pump speed, speed of material roller and stirring speed are displayed normally.
13. Check whether the parameters can be set normally; Check whether the spray nozzle of both sides can be set normally.
14. Check whether the automatic sprinkling (scattering) cloth is normal.
15. Clean the asphalt filter.
16. Check for air leakage on the road.
Powder distributor
02
1. Check engine oil, gear oil and antifreeze for leakage or lack.
2. Check the steering oil and brake fluid for leakage or lack.
3. Check and grease the transmission part of the Vehicle.
4. Check whether the connecting bolt of the whole owner's auxiliary beam is loose.
5. Check whether the battery of the car has lost power, and the polarity of the main power cord must be correct; Please consult dagon customer service before connecting the main power cord.
6. Grease the screw and roller bearings.
7. Check whether the gear oil of the transmission box is enough or not.
8. Check whether the hydraulic oil is within the upper and lower limits of the scale.
9. Check whether the material level meter turns normally.
10. Check whether the dust filter element is clean or damaged.
11. Check whether the inlet valve is normal.
12. Check whether the wiring terminals of the circuit system are loose.
13. Hang the force exTractor, turn on the power supply, open the material door, idling the screw and measuring rod for 30 minutes to 1 hour. Check whether the speed, screw speed and measuring roller speed are displayed normally. When the temperature is low, open the material door, open the measuring stick to turn the hot car for half an hour and then work.
Asphalt spreader
03
1. Check engine oil, gear oil and antifreeze for leakage or lack.
2. Check the steering oil and brake fluid for leakage or lack.
3. Check and grease the transmission part of the vehicle.
4. Check whether the connecting bolt of the whole owner's auxiliary beam is loose.
5. Check whether the battery of the car has lost power, and the polarity of the main power cord must be correct; Please consult dagon customer service before connecting the main power cord.
6. Check the small transmission shaft for noise and wear.
7. Check the oil transfer box for oil leakage, and check the amount of lubricating oil.
8. Check the amount of hydraulic oil and heat conduction oil if necessary, and replace it if it has been used for more than two years.
9. Check whether there is water or mice in the power distribution cabinet of the equipment to clean it timely and tighten the wiring terminals.
10. Check the wear of asphalt pump disc root.
11. Check whether there are leaves and water on the top of the asphalt tank, and clean it in time to ensure the smooth flow of the asphalt overflow pipe.
12. Check the valve status of asphalt pipeline and thermal conductivity pipeline, and check whether the pneumatic butterfly valve is flexible.
13. Clean the carbon accumulation of Burner; Clean diesel filters and nozzles.
14. Check the buttons, switches and normal operation of board A and board E.
15. Check thermal oil for noise and stuck.
16. After heating the equipment, check the asphalt pump for noise and stuck.
17. Clean the asphalt filter filter, check or replace the sealing ring.
18. After heating, check that the nozzle solenoid valve and the nozzle cylinder operate normally without leakage.
19. Check whether the speed, pump speed and temperature display are normal.
20. Check whether the automatic spill is normal.
Sanyi Double Eleven Carnival Feast,The purchase of the machine can be reduced by 15 thousand yuan immediately.,Miss waiting for a year! Xiang yuan 11.4 Golden Egg Smashing Activity Superimposed Enjoyment,Up to 10,000 yuan discount prize waiting for
Jiangsu Taixin Machinery Co Ltd(Hereinafter referred to as“Taixin Machinery”)As the director unit of Piling Machinery Branch of China Construction Machinery Industry Association,Actively participated in the third and fourth member congresse
baumaCHINACountdown to 2024:23 days!New Quality Trinity· Enter the museum tomorrow→Create a low-carbon future together! Tomorrow,Sany Group is stationedbaumaCHINAPavilion 2024, Openbauma CHINA Construction of booth 2024。 Novembe
Guidance for extensive and in-depth development“Make contributions to the 14th and 15th National Congress、Strive for a new journey”Thematic Labor and Skills Competition,Vigorously carry forward the spirit of labor、Craftsman spirit,Prom
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China