Products Center
More Products

Kobelco: through difficult times to ensure safety and resume work in stages

August 05, 2020

In accordance with the requirements for the resumption of production and operation of enterprises formulated and issued by the governments of chengdu and hangzhou, efforts shall be made to resume production and operation in stages during the special period of the epidemic on the basis of good prevention and control of the epidemic. For this, god steel construction machine China made a full response.

Shigang jianji (China) co., LTD has set up a leading group for epidemic emergency under the general command of the chairman, formulated the emergency plan for epidemic prevention and control and the emergency plan for canteen, implemented the responsibilities of all departments, and prepared enough emergency supplies. After establishing a complete response mechanism, I applied to chengdu longquanyi district (chengdu economic and technological development zone) bureau of economy and information technology for partial resumption of work on February 14. After the site review by the relevant departments of longquanyi district, the project was partially approved to resume work on February 17.

Hangzhou shanxiang construction machinery co., LTD., in accordance with the requirements of the local government, was approved by the local competent authority to resume work on February 12, and resumed work on February 15.

● management of personnel in and out of the company to ensure security

Kobelco construction machinery (China) co., ltd. requires its employees to report the health status of themselves and their family members every day, and to implement the isolation of their homes according to the requirements issued by the government to ensure the health status of every employee on duty. And according to the "disinfection plan during the outbreak" to all the company's sites for disinfection treatment.

Encourage employees to drive to and from work by themselves, provide strictly disinfected buses for employees on public transportation, and carry out testing, disinfection, temperature measurement and registration as required.


● meal security

The canteen of the company makes lunch bento for employees and assigns them to be distributed, so as to minimize the occurrence of aggregation.

Kobelco will be under the command of the emergency response team to overcome the difficulties. On the basis of epidemic prevention and control, we will provide products and services to our customers as soon as possible to contribute to the orderly recovery of the society.

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China