Products Center
More Products

Keith reminds: start production & save your life!

June 16, 2020

& other; Return to work & throughout; The complete

Today is February 3, the Spring Festival holiday in 2020 has ended, but with the epidemic, most provinces and cities have delayed the resumption of work until February 10, some even later, are the owners still calm down?

The progress bar of the New Year has been opened for a period of time, most of our owners have to pay the mortgage, the construction site to meet the deadline, and a few days ago to set their own annual goal … & hellip;

On the one hand is the burden of work and life, on the other hand is the burden of life and health. Today, Lord Keith will help you pick up on some of the things you should be aware of when you return to work!

1
On the way back to work “ Notes ”

The return trip is also the peak of the Spring Festival travel rush, with dense flow of people, traffic and logistics. Crisis & throughout; . It is reported that at present, there are 2,373 stations across the country to carry out in-station or out-station temperature measurement. Passengers are advised to seek medical advice at 37.3℃.

If hot passengers are found on the train, the railway department will start the emergency handling procedures, decisively isolation and disinfection, as soon as possible to transfer to the front station.

Therefore, we should do a good job on the return flight temperature measurement, there are suspicious symptoms do not return; At the same time, return to the process of personal protection; Avoid public transport and wear a mask at all times; If the temperature is too high, please stay away from the crowd, and go home to rest, when necessary to the hospital!

{2 _17} Digging machine start “ Save & throughout; Secret

We should prepare for a protracted war, and pay special attention to the daily protection after the project starts:

Keep a distance of more than 1m between people when communicating with people at the construction site; If there are a lot of people at the site, wear a mask at all times; Wash your hands frequently and drink plenty of water. Wash your hands strictly in six steps before eating and after using the toilet. In addition, tea set supplies such as the use of boiled water after soaking disinfection.


Case C series Excavator can provide excellent driving environment for operators. The cab can meet different weather conditions, the all-weather monitoring system will be set in the cab temperature for constant temperature control, eight vents to provide good air circulation. At the same time, the new c-series cab has 50pa of preloading, which can keep noise, dust and virus out of the cockpit! Effective virus isolation!

The current outbreak is urgent and cannot be prevented too much. Therefore, if conditions permit, please wear gloves and masks during operation, remember to close the door of the cab during operation, and please sterilize and ventilate the cab before starting and finishing work every day.

3
Use the machine during rush hours. Remind & throughout;

The delay in the resumption of work means that the work period after the year is more urgent. In order to meet your production goals, it's time to get your case C series to use more H and SP files.

Case C series Excavators are of solid workmanship, accurate control and efficiency in operation “ Ceiling & throughout; Higher, the critical moment has a good “ The compressive & throughout; Ability! The design of three working modes, combined with faster rotary speed and stronger rotary torque, provides users with an opportunity for efficient construction. In this rush period, the problem of fuel consumption to us, you rest assured to use SP gear, we help you save costs, to ensure the maximum benefit!


The disease will pass, and we'll get to work.
Urgent time and heavy task,
But we must not relax our vigilance against risks!
Production is important, life is more important!
Hardship only makes us more resilient,
Come on, engineer!
& have spent

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China