April 30, 2020
On January 8, the tianshui highway administration high maintenance center held a 2019 training course on the new highway asphalt pavement maintenance technical specifications. More than 30 members of the center's leadership, production technology department, qiaohan technology department and safety management department participated in the study of the new specifications.
The characteristics, modification background, basic regulations and green maintenance of the new specification are fully interpreted, so that the trainees have a systematic understanding of the new specification.
They expressed that this training course provided theoretical knowledge for the application of technical personnel in future maintenance and production. Maintenance in the future, follow the scientific decision-making, the principle of prevention first, reliable, durable, energy conservation, environmental protection, carry out the whole life cycle maintenance cost concept, selection of technical, economic and reasonable asphalt pavement maintenance plan, promote the preventive maintenance of asphalt pavement, and actively yet prudently used new technology, new material, new technology and new equipment.
Correspondent: hu zeting
-
ACE Group Invites You to the 140th Canton Fair As golden breezes bring crisp autumn air and the fragrance of osmanthus drifts through the air, the 140th China Import and Export Fair (Canton Fair, Autumn Session) arrives as scheduled. Known as "Chi
ACE Group successfully concluded its three-stop September exhibition tour: Mining Indonesia (Jakarta), MiningWeek & MinePro 2026 (Ulaanbaatar) and Paving Expo (São Paulo), showcasing mobile crushing stations, BAP200+RAP80 asphalt plants and mining excavat
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China