Products Center
More Products

[Product style] Fangyuan HZS120D mixing station in service for construction of He-Ha Expressway

October 10, 2022

Recently,FangyuanHZS120DCompletion of installation and commissioning of concrete mixing station,Served in the construction of He-Ha Expressway。

The installation period of the mixing station is extremely tight.,Reasonable arrangement by service personnel,Close cooperation with users,Overcome all difficulties,Successfully completed the installation and commissioning of equipment,At present, it has been put into use formally.。

The project is《National Highway Network Planning》Medium“Longitudinal line”Expressway from Hegang to Dalian.(G11)The connecting line of,The total length of the route is 468km。Heha Expressway passes through Hegang.、Yi Chun、Tieli、Suihua、Harbin,It connects many national and provincial trunk highways.,A significant network effect has been formed.。Hegang to Yichun section or《Expressway Network Planning of Heilongjiang Province》Overall Layout 2866 Planning Network“Horizontal two lines”The starting section of Hegang-Qiqihar Expressway,An Important Passage for East-West Transportation in Heilongjiang Province。

  

FangyuanHZS120DVertical mixing station to occupy a small area、And that production efficiency is high、Modular layout、The feature of quick installation is highly praised and trusted by users.。

Complete Equipment Co., LtdJiang Luyang

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China