November 18, 2024

A heavy load is like a loose one A light load is like the wind
——10MWFan+Double-faced hand for hoisting of mixed tower drum
✨ 130m:138+9m@280t
✨ 140m:147+9m@265t
✨ 145m:153+9m@250t
✨ 150m:159+9m@230t
✨ 160m:168+9m@205t
✨ 170m:177+9m@180t

Hoisting is fast
✨ Ngine power matching follow-up technology,Light-load lifting speed increased by 40%;
The structure is compact
✨ Minimum super-lift radius 15m,Kiloton products with the strongest site adaptability;
Transport economy
✨ 145mHigh 10MWIntegral hoisting and transfer transportation of Wind Turbine 28-30 cars,Transfer cost savings 15%Above。
On December 12th, Asian Construction Equipment Group Co., Ltd. (abbreviated as ACE Group) Xuchang Production Base hosted a delegation of senior clients from The Republic of Tajikistan for an in-depth facility inspection. Guided by the warm winter sun, th
Despite the biting cold of early January, the spirit of international cooperation remained warm and vibrant. On January 5, 2026, three clients from Cameroon traveled thousands of miles to Henan, China, arriving with high expectations for a visit to Asian
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China