November 13, 2024
The temperature plummeted,Winter condition mode on
Whether the loader can be started smoothly
Become the top priority in the hearts of many machine friends
Mountain Mechanical Loader“For the winter”Maintenance Guide
Warm online,Start by servicing the engine
Help the machine to start smoothly,Start work efficiently
Loader Winter curing
SEM
MACHINERY
The starting is exquisite,Don't worry about starting work
The loader engine starts,Attention first“Cold”After“Hot”
Make full preparations according to the time.,Winter construction is more in place
The single starting time shall be less than 10s
At least 60 minutes between two startss
Stop starting when it cannot be started for three consecutive times
Restart after finding out the cause and eliminating the fault

After starting,3 minutes of idle warm-up is required.
The idling time in winter should be extended appropriately.
Do not immediately run the engine at high speed

Loader Winter curing
SEM
MACHINERY
There are considerations for downtime,The state does not drop the line
End the day's work,Before entering a full shutdown
Give the engine a little time to slow down.,Smooth start the next day
After turning off the key switch
The urea pump depressurizes、Suck back
Therefore, it is necessary to wait for 3 minutes.
The main power supply can be turned off
Prevent the urea solution in the pipeline from crystallizing at low temperatures
Avoid frost cracking of the pipeline

In case of long-term shutdown and storage,It needs to be started once a month
Idle for 5 minutes,Carry out relevant operation and inspection
Periodically activate the complete machine status,Sustained good performance

Loader Winter curing
SEM
MACHINERY
Drain well,Performance is under control
After daily completion,It needs to be drained in time
Engine Shuihanbao drain valve、Brake the drain valve of air reservoir
Fuel tank bottom drain valve
Lock the three water drain valves.,Reduce“Frozen oil” Probably
Power output is in good condition,More efficient operation

Smooth start,I'm not afraid to work in winter.
Reliable hard power
More“For the winter”Maintenance secret book on the way
Stay tuned,Be there or be square
On December 12th, Asian Construction Equipment Group Co., Ltd. (abbreviated as ACE Group) Xuchang Production Base hosted a delegation of senior clients from The Republic of Tajikistan for an in-depth facility inspection. Guided by the warm winter sun, th
Despite the biting cold of early January, the spirit of international cooperation remained warm and vibrant. On January 5, 2026, three clients from Cameroon traveled thousands of miles to Henan, China, arriving with high expectations for a visit to Asian
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China