October 28, 2024
As the temperature gradually decreases.,The warm air function of the loader is particularly important.。In order to make everyone feel warm in their work.,The following will introduce the operation method of the loader heating system in detail.。
01
Preliminary preparations
1. The heating system of the XGMA fuel loader is heated through the circulation of engine cooling water.。The engine coolant shall be replaced once a year according to the maintenance regulations.,Therefore, make sure whether the engine coolant has been maintained and replaced before starting the heating operation.,Ensure that the coolant system level is at the required level,There is no leakage in the pipeline、Clean、Smooth、 Hygiene 。
2. Operate the warm water valve:The warm water valve is typically located near the engine compartment of the loader,Please locate and gently rotate counterclockwise to the on position,Ensure that hot water flows smoothly into the heating system。Please pay attention to the force during operation.,Avoid damaging the valve。
3. Check the engine status:Make sure the engine is running properly,If just started,Please warm up a little,O that the heating system works better。
4. Clean air outlet:Check the heating air outlet carefully.,Make sure that there is no foreign material clogging,Ensure air circulation。
02
Specific operation process
1. Position the heater switch:The heater switch is usually located on the control panel in the cab,Different loader models may have different positions.,However, the signs are obvious.。
2. Turn on the warm air:Turn the heater switch to the heater position,Turn on the air outlet switch of the air conditioner,The heating system starts at this time.,You will see the red warm air indicator light on,Indicates that the warm air is running。
3. Adjust temperature and air volume:Adjust the temperature and air volume according to your own needs。Temperature and air volume are usually classified as high、Medium、Low third gear。It is recommended to start with a low gear,Step by step to find the settings that work best for you。
4. Adjust the air outlet direction:Adjust the direction of the warm air outlet as required,Make sure that the warm air can blow to you accurately.。
03
Precautions for use
1. Regular maintenance and inspection:To ensure the stable operation of the heating system,Please check and maintain it regularly.,Includes a fan、Radiator、Pipes, warm water valves and other components。If damage or malfunction is found,Please repair or replace it in time.。
2. Keep the cab clean:A clean cab is not only pleasant.,It also contributes to the efficient operation of the heating system。Please clean dust and debris in the cab regularly.,Prevent it from entering the heating system。
3. Safety first:When operating the loader heater,Please pay attention to safety.。Prevent foreign matters from entering the air outlet,And prevent the heating system from running under high load for a long time.,So as not to cause safety accidents.。
03
Warm reminder
Master the correct warm air operation skills of the loader,Let warmth accompany your every work journey.!
If you have any questions or need help,Please feel free to contact our after-sales service team。
Welcome to call the official customer service hotline of XGMA
400-6618-668
Recently,Good news from Ningtiaota Coal Mine of Shaanxi Coal Group,China Railway Equipment GroupEJM315/4-2FIntelligent Rapid Tunneling Equipment CreatedLow power and short type(Cutting motor power 315kw)Digging and anchoring integrated machine sem
“Hot”The fourth quarter of the war Increase production capacity Expanding the market, promoting R & D and improving efficiency, Zhonglian Agricultural Machinery is firmly moving forward, showing a new trend of vigorous and
November 21, 2024,As an important partner,Party Secretary of Shaanxi Construction Machinery Co., Ltd.、Chairman Yang Hongjun was invited to attend the celebration of the 12th anniversary of the founding and development of Anhui Liju Group and
November 19-21, local time,Chinese President Xi Jinping pays state visit to Brazil。 Follow the steps of President Xi Jinping,Today,We walked into Trinity Brazil together.。 Back in 2007,Sany Heavy Industry Co., Ltd. was registered in Sao Pa
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China