Products Center
More Products

China Railway Equipment Helps Complete the Main Project of Qiankai Tunnel in Peru

October 25, 2024

Recently,Constructed by China Railway Tenth Bureau,China Railway Equipment Mining Method Tunnel Mechanization is responsible for the construction of the Qiankai Tunnel Project in Peru.,The main project of the tunnel has been completed.,It marks the completion of the tunneling task of the complete set of mechanized construction equipment for the whole process of mining tunnel tailored by China Railway Equipment for the project.。

Qian Kai Tunnel is 1839 meters long.,The shallow-buried section is 1168 meters long.,Accounting for 63% of the total tunnel length.5%,The minimum burial depth is only 6.6 meters,Need to underpass the Pan-American Highway、Archaeological areas and other areas,The geological conditions are complex,Including geological faults、Large sand cavity and aeolian sand layer,The construction is extremely difficult。China Railway Equipment Co., Ltd. has rich experience in mechanized tunnel construction.,A complete set of mechanized equipment was tailored for Qiankai Tunnel.,Through efficient collaboration,Effectively reduce the impact on the surrounding environment,The construction quality and safety are ensured.,It provides an innovative comprehensive solution for the construction of overseas tunnel projects.。

01DJ2ADouble-arm rock drilling jumbo

Drilling construction of rock drilling jumbo。

02GJ2AArch frame installation trolley

Arch frame installation trolley tunnel“Find the top”。

03HP3017BConcrete wet spraying trolley

Concrete support construction by wet spraying jumbo。

04Intelligent template trolley

Formwork trolley for secondary lining construction。

05Waterproof board laying trolley

Laying of large-width waterproofing membrane in tunnel。

China Railway Equipment Helps Complete the Main Project of Qiankai Tunnel in Peru 24 October 2024 19:42 Henan

Recently,Constructed by China Railway Tenth Bureau,China Railway Equipment Mining Method Tunnel Mechanization is responsible for the construction of the Qiankai Tunnel Project in Peru.,The main project of the tunnel has been completed.,It marks the completion of the tunneling task of the complete set of mechanized construction equipment for the whole process of mining tunnel tailored by China Railway Equipment for the project.。

Qian Kai Tunnel is 1839 meters long.,The shallow-buried section is 1168 meters long.,Accounting for 63% of the total tunnel length.5%,The minimum burial depth is only 6.6 meters,Need to underpass the Pan-American Highway、Archaeological areas and other areas,The geological conditions are complex,Including geological faults、Large sand cavity and aeolian sand layer,The construction is extremely difficult。China Railway Equipment Co., Ltd. has rich experience in mechanized tunnel construction.,A complete set of mechanized equipment was tailored for Qiankai Tunnel.,Through efficient collaboration,Effectively reduce the impact on the surrounding environment,The construction quality and safety are ensured.,It provides an innovative comprehensive solution for the construction of overseas tunnel projects.。

01DJ2ADouble-arm rock drilling jumbo

Drilling construction of rock drilling jumbo。

02GJ2AArch frame installation trolley

Arch frame installation trolley tunnel“Find the top”。

03HP3017BConcrete wet spraying trolley

Concrete support construction by wet spraying jumbo。

04Intelligent template trolley

Formwork trolley for secondary lining construction。

05Waterproof board laying trolley

Laying of large-width waterproofing membrane in tunnel。

▲Smooth delivery of complete sets of equipment for full-process mechanized construction of mining tunnel

 

▲Mechanized Construction Service Team of Chancay Port Tunnel Project in Peru

▲Carry out equipment training、Maintenance、Construction

During the construction of the Chancay Tunnel in Peru,China Railway Equipment provides 13 sets of various types of special equipment and comprehensive support services.,Including a wealth of experience in dispatch、Skilled after-sales maintenance team,Establish a special service guarantee system,Make every effort to promote the high-quality construction of Qiankai Port Tunnel。

In recent years,China Railway Equipment Co., Ltd. has made intensive efforts in the field of mechanized tunnel construction by mining method,The cantilever Roadheader was developed.、Rock drilling jumbo、Wet spraying trolley、Arch frame installation trolley、Anchor trolley and a series of core products,The complete equipment operation system of hard rock tunnel represented by three-arm rock drilling jumbo and the complete equipment operation system of soft rock tunnel represented by cantilever Roadheader are constructed.,It is welcomed and favored by colleagues in the industry.,And respond positively“The Belt and Road”Initiative,Continuously contribute new technologies to global underground space development、New products、New scheme,Promote innovation and development in the field of underground space construction with practical actions。▲Smooth delivery of complete sets of equipment for full-process mechanized construction of mining tunnel

 

▲Mechanized Construction Service Team of Chancay Port Tunnel Project in Peru

▲Carry out equipment training、Maintenance、Construction

During the construction of the Chancay Tunnel in Peru,China Railway Equipment provides 13 sets of various types of special equipment and comprehensive support services.,Including a wealth of experience in dispatch、Skilled after-sales maintenance team,Establish a special service guarantee system,Make every effort to promote the high-quality construction of Qiankai Port Tunnel。

In recent years,China Railway Equipment Co., Ltd. has made intensive efforts in the field of mechanized tunnel construction by mining method,The cantilever Roadheader was developed.、Rock drilling jumbo、Wet spraying trolley、Arch frame installation trolley、Anchor trolley and a series of core products,The complete equipment operation system of hard rock tunnel represented by three-arm rock drilling jumbo and the complete equipment operation system of soft rock tunnel represented by cantilever roadheader are constructed.,It is welcomed and favored by colleagues in the industry.,And respond positively“The Belt and Road”Initiative,Continuously contribute new technologies to global underground space development、New products、New scheme,Promote innovation and development in the field of underground space construction with practical actions。

Featured

more

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China