August 28, 2024
In tunnel construction,The inverted arch is a reverse arch structure at the bottom of the tunnel to improve the stress condition of the upper supporting structure.,It is the main component of the tunnel structure.。Because the inverted arch is located at the bottom of the tunnel,Temporary road disruption will occur during construction,Affect the traffic of construction Vehicles and personnel on the tunnel face,Thereby affecting the construction progress of the entire tunnel.。For this reason,Trestle must be used,To ensure that the tunnel construction road can be constructed under normal traffic conditions.。
Developed by Xizhu CompanyYGSeries hydraulic inverted arch trestle not only absorbs the advantages of traditional trestle,On this basis, high strength steel is used as the main beam.,And that bear capacity is improved;Properly designed support structure and connection method,Increase the stability and service life of the trestle;New running design is adopted.,Improve the stability of trestle。Design two operating systems that are simple and easy to use,Reduce the difficulty and cost of use。YGThe walking action of the series trestle is driven by hydraulic motor、Solid tire running mode。Adjustable front outrigger height,At the same time, it relies on the hydraulic cylinder to control the left and right lateral movement.,O as to realize the turning、Straight attitude conversion;The approach bridge is connected with the bridge body in a hinged manner.,Through the telescopic action of the cylinder,Realize the lowering and lifting actions of the approach bridge。The main trestle is driven by hydraulic motor with solid tires.,The operation is simple、Be flexible,The front end of the trestle is supported on the initial support surface of the inverted arch,The rear end is supported on the poured filling surface.,The lower suspended space can ensure that the inverted arch and filling construction can be carried out without disconnection.。The trestle can be moved conveniently.、Climb、Walk,Can meet complex working condition。At the same time, this product can be equipped with side wall formwork and central ditch formwork.,The action is simple、Convenient、Easy to control。Successful Development of Hydraulic Inverted Arch Trestle,It not only fills in the blank of China Communications Group in the field of mountain tunnel equipment.,It also marks a new breakthrough in the field of tunnel installation by Xizhu Company.。
December 11, 2024,Dongfeng Commercial Vehicle 2025 Annual Partner Conference Held in Chengdu。Based on the final season of 2024,Dongfeng Commercial Vehicle joins hands with more than 600 dealers nationwide、There are more than 1000 representatives of mor
December eleventh,With“WE ARE ONE——A family、One heart、Work together、It's going to work”The 2025 Global Supply Chain Strategic Partnership Conference of China Heavy Truck Group was held in Shandong International Convention a
The other day,Final judgment of the People's Court of Changsha County, Hunan Province,It was found that Anbaituo Trading Co., Ltd. had caused damage to the commercial reputation of Sunward Intelligence.,Its behavior constitutes unfair competition.
December 2,Beijing Party Branch of International Corporation and Construction Machinery Party Branch of China Construction Machinery Corporation、The General Party Branch of China has launched“Forging New Productive Forces and Promoting New Indust
Copyright Notice 2002-2025 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China