Products Center
More Products

Jiangsu Junma 2YJ8/10: Static Roller for Improving Construction Efficiency

August 26, 2024

Jiangsu Steed 2YJ8/10:Static roller for improving construction efficiency

The years are quiet,I hope I will be strong and persistent without hurry.,

Slow and steady,Pave the way for every dream,Achieve a better self。!

Junma

In urban construction、Development of transportation infrastructure and sports venues,Compaction and repair of the pavement is essential。Today,We want to introduce an efficient and reliable construction equipment for you.——Jiangsu Steed 2YJ8/10 Two-wheel static roller。Its appearance,It will bring new opportunities and challenges for modern construction.!

01

Scope of application

 

Application

 

 

2YJ8/The two-wheel static roller has a wide range of application,Especially suitable for the following occasions:

Urban roads:Ensure the smoothness and safety of urban traffic。

Intercity and county and township roads:Improve the infrastructure level of rural and inter-city transportation。

Sports ground:Provide a solid foundation for the sports field。

Other industrial sites:Meet diversified industrial construction needs。

02

Performance characteristics

Advantages

 

1. Mechanical drive,Travel speed in third gear

This road machine is equipped with a mechanical drive system.,With third gear driving speed,So that it can respond flexibly under different working conditions.,Ensure the construction efficiency。

2. Hydraulic steering,The operation is flexible

Hydraulic steering design and articulated frame construction,Easy to operate,Let the operator in the complex construction environment.,Be able to control the machine easily。

3. Independent Sprinkler system

The equipment is equipped with anticorrosive large-capacity Sprinkler tank.,Two sets of independent gravity natural Sprinkler systems at the front and rear,It can effectively control the wetting effect required in the working process.,And that compaction quality is improve。

4. Dual steering wheel control design

Specially designed dual steering wheel control system,It is not only convenient for the operator to observe the edge compaction,But also greatly improves the accuracy of construction.。

5. Optional electronically controlled pressure water spray system

According to the actual demand,Users can also choose to be equipped with an electronically controlled pressure sprinkler system.,Further improve the flexibility and efficiency of equipment in construction。

 

2YJ8/Two-wheel static roller has excellent performance and wide applicability,Be your go-to person on construction projects。Whether it is the construction of urban roads,Or the restoration of rural roads?,It can help you.!If you want to know more about this device,Please feel free to contact us.,Look forward to working with you.,Jointly promote the development of the construction industry!

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China