June 20, 2024
The unit maintenance shall be done well.,These checks are indispensable.
During unit maintenance,The more detailed the inspection.
The more quickly potential problems can be identified and resolved.
Engine coolant、Fuel oil、Exhaust smoke
Oil level、Coolant level、Cooling fan
Heater, etcAll of them should be carefully examined.
Change the oil、Machine filter、When the oil is filtered
A little careless
It will affect the performance of the engine and even the unit.
Correct operation process
Brother Kang has sorted it out for you.
Standard Operation Procedure for Oil Change
With engine off
Open the oil drain valve
Drain the oil from the oil pan
Clean the plug threads and sealing surfaces
Add new engine oil to the proper position.
Standard operation process for changing machine filter
Clean the sealing surface of the filter head
Lubricate the rubber seal of the filter with engine oil
Replenish the oil filter with clean oil
According to the requirements of the manufacturer
Install the oil filter.
Replacement method of fuel filter
Remove the fuel filter
Remove sealing ring for screw connection
Wipe and clean the contact surface with the gasket
On new filter
Assemble new sealing ring and oil-water separator
Replace the new filter
Open the fuel valve after proper tightening.
Check for leaks
Several XCMG climbing platform fire engines with a total value of more than 10 million yuan lined up to go overseas with surging momentum.,Protect the beautiful world In recent years,XCMG Fire Fighting for High-rise Rescue、Industrial
November nineteenth—22nd,Secretary of the Party Committee of the company、Chairman Peng Zhengyong led a team to Xinjiang to carry out a series of business activities,Visited the Xinjiang Autonomous Region Highway Development Center respectively.、X
bauma CHINA 2024(Shanghai BMW show)Will be November 26-The curtain was raised at the Shanghai New International Expo Center on the 29th.!Wirtgen Group will bring Wirtgen、Fogler、Humvee、Kelei's Four Brands Appear at the Exhibition,Showcase innovativ
When the north wind passes through,The most romantic thing is a night of spring breeze.,It was delivered.“To turn thousands of pear trees here in full bloom white.”A grand scene。However,Behind this beauty.,With the increasing use of tr
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China