May 29, 2024
Mine、Railway、 Ship 、Oil and gas field industry
Rapid development
The application of high-powered engines is becoming more and more popular.
How to forge a stronger power“Core”
Meet user and market expectations
Come alongCummins base in ChongqingLooking for answers
Manufacturing upgrade,Production capacity has reached a new high
New Cummins Base in Chongqing
It covers an area of400Mu
Annual production of high-powered engines
23000Above Taiwan
Built according to Cummins global advanced standards
SetInnovation Technology Center、Advanced manufacturing system
Efficient logistics systemAll in one
Advanced intelligent manufacturing and R & D strength
It can meet the diversified needs of China's high-horsepower market.
Complete production line,Fine and excellent quality
The new base has3 assembly lines
And1 centralized sub-assembly line
For assembly14 liters、19 liters
38 liters、50L and 60LEngine
Production line set digitization、Intelligent
Automation is integrated
Ffectively improve production efficiency
Establish 9 test rooms at the same time
Overlay11-72 litres of diesel
And natural gas engineTest
Equipped with advanced hardware equipment and control system
Stable operation of user equipment
Provide solid and reliable quality assurance
Intelligent logistics,The delivery is stable, accurate and fast
Logistics system based on international logistics industry
Professional planning and building
Combined with plant capacity
Improvement and upgrading of market demand
Optimize storage across the board、Distribution
And warehouse management
Adopt advanced automatic guided VehiclesDistribute materials
Smart and efficient,Convenient and fast
Ensure delivery quantity、Time、The station is accurate
Effectively reduce the labor intensity of employees
Improve distribution efficiency
Innovative R & D,Green New Future
New High Horsepower Technology Center
Is the only focus of Cummins in China
High-horsepower engine technology research and development institutions
It is equipped with complete engine
Mechanical performance test of parts and components
Emission test、Durability test
And trial installation of new products.
And the ability to restructure existing products.
The test bed is equipped with a series of advanced equipment.
Emission equipment can meet the requirements of non-road country 4.
And AmericaT4FNon-road four-stage
Emissions regulatory requirements
Alternating current dynamometer
Maximum power up to 3000kW
During the test,
Fuel consumed is converted into electrical energy
Help factories reduce carbon emissions
Achieve green development
Build Strength with Strong Intelligence
Forger“Core”Quality
Click on the video
Start the exploration tour of Chongqing Cummins Base
Shanghai BMW show —— The grand meeting of the construction machinery industry Shanghai BMW show(bauma CHINA)The largest in Asia、The world's second largest construction machinery industry event。It brings t
November 14-The 15th,Party Secretary of Shaanxi Construction Machinery Co., Ltd.、Chairman Yang Hongjun,Chief Financial Officer Yang Juan and his delegation went to Hainan Pangyuan Machinery Engineering Co., Ltd. to investigate the const
Recently,The construction site of an open-pit iron ore mining project in Liaoning Province is a hot scene.,Count Taishan TuiSE800 mine excavators are on fire.,Work together to speed up the construction period,Press the acceleration key for the efficien
According to Gaogong Industrial Research Institute(GGII) Statistics ,In 2023, the overall sales volume of mining cards in China was about 30,000 units.,The sales volume of new energy mining cards is more than 1500.。With“Side mining、Edge repair&rd
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China