May 27, 2024
Perform rigorous testing that exceeds industry standards many times over
Reliability testing:Complete 4000 loading action cycles for 60 consecutive days(1000 requirements at the same level in the industry)
Enlarged bridge durability test:Complete 50000 action cycles for 90 consecutive days(The industry requires 10000 times at the same level.)
Reliability testing:Complete 5000 loading action cycles for 60 consecutive days(Industry peer requirements 800~1000)
Reliability testing:Complete 5000 loading action cycles for 60 consecutive days(Industry peer requirements 800~1000)
Strictly control the quality pass and firmly build the quality defense line
Ding Li,You are trustworthy
AI Translation Notice: This article was translated from Chinese into English using AI-assisted translation. Original source: http://news.lmjx.net/2024/202405/2024052717013988.shtml. The translation may contain errors, and the original Chinese source should be referred to for accuracy.
ACE Group Invites You to the 140th Canton Fair As golden breezes bring crisp autumn air and the fragrance of osmanthus drifts through the air, the 140th China Import and Export Fair (Canton Fair, Autumn Session) arrives as scheduled. Known as "Chi
ACE Group successfully concluded its three-stop September exhibition tour: Mining Indonesia (Jakarta), MiningWeek & MinePro 2026 (Ulaanbaatar) and Paving Expo (São Paulo), showcasing mobile crushing stations, BAP200+RAP80 asphalt plants and mining excavat
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China