May 11, 2024

Excellent lifting performance
14.9~90m Large-section single-cylinder pin main arm+Double Luffing,Equipped with specific optional arm head,The whole machine can meet 180tBridge lifting、126tThe bridge is hung alone。
Better site adaptation
Telescopic track chassis with variable track,360°All-round construction;
Equipped with high-torque traveling mechanism,Gradeability greater than 25°And carry 4°Walk on the slope,It is more suitable for construction in muddy and other harsh and narrow sites.。
Economical, convenient and efficient
Quickly realize 8-section boom switching to 5-section boom,Performance improvement of specific arm length 18%Above。One-button automatic retractable,A variety of boom telescoping sets,Electronically controlled operation,0.7sQuick response;
Optional sliding belt load displacement counterweight,Post deflection 1.2m,Reduce up to 20 tons of counterweight,Reduce operating expenses。Height of complete machine with full counterweight shall not be greater than 4.49m,It is convenient to pass through height-limiting obstacles,Efficient construction。
Better Smart Security
The hydraulic system is equipped with advanced split-flow control technology.,Fficient promotion of boarding compound action、Travel control is more stable and reliable。
On December 12th, Asian Construction Equipment Group Co., Ltd. (abbreviated as ACE Group) Xuchang Production Base hosted a delegation of senior clients from The Republic of Tajikistan for an in-depth facility inspection. Guided by the warm winter sun, th
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China