Products Center
More Products

Reform in Action ⑥ | China Railway Construction Heavy Industry comprehensively publicizes and implements a series of systems and measures for safe production of China Railway Construction, and builds a strong line of defense for high-quality development.

April 30, 2024

In order to implement the work plan of deepening and upgrading the reform of China Railway Construction Corporation,,Build a Safety Defense Line for High Quality Development,April 28,China Railway Construction Heavy Industry Co., Ltd. held a special meeting on safety production in the second quarter of 2024,To convey the spirit of China Railway Construction Corporation 2024 Safety Production Training Course and System Measures Publicity Conference,To arrange and deploy the work of safety production in the next stage。Deputy Secretary of the Party Committee of the Group、General Manager Wang Peng attended the meeting and made a speech.。

The meeting was publicized《Measures of China Railway Construction Corporation Limited on the Supervision and Administration of Work Safety》《Production Safety Accident Management Provisions of China Railway Construction Corporation Limited》《Three-year Action Implementation Plan for Safety Production of China Railway Construction Corporation Limited(2024—2026)》,Focus on the three-year action to tackle the root causes of safe production、Construction of safety standardization、Specific requirements are put forward for the investigation and remediation of hidden dangers of major accidents.。

The meeting pointed out,“May Day”The holiday is coming,All units should conscientiously make work plans and manage on-duty personnel arrangements during the holidays.,Leaders at all levels should take the lead in carrying out safety inspection before the festival.,Strengthen safety education and training for overtime workers,Do a good job of lifting、Hot work、High on the edge、Management and control of dangerous operations such as rotating machine tools,Do a good job on the production site、Canteen and dormitory、Fire safety work in storage area。

The meeting emphasized,Safety is no small matter,Everyone has a responsibility.。Each unit, from the principal person in charge to the first-line terminal team leader, should strictly follow each level.“Three tubes and three necessities”And“Who's in charge? Who's in charge?”Requirements of,Classified supervision within the scope of duties、Supervision and inspection、Rectification of hidden dangers and other work,Earnestly shoulder their own responsibility for safe production;It is necessary to investigate and find out the qualification and ability of the outsourcing team in the enterprise system.、Performance level、Safety records, etc.,Effectively strengthen the safety management and control of the outsourcing team;It is necessary to strengthen the work of the unit.(Department)Care and supervision of employees,There must be one.“Granny's mouth”,Speak from time to time、Talk about everything、Talk every day、Speak everywhere,Always remind employees to pay attention to safety in production;Leading cadres should be strengthened.、Training of site management personnel,Improve their safety production quality and safety business skills.。

Meeting requirements,Systematic governance should be strengthened.,Systematically promote the implementation of safety production work。Safety awareness should be raised.,Recognize the security situation,Coordinating security and development with systematic thinking;Responsibility for safety in production should be compacted.,Achieve safety five by compacting the safety responsibilities of all staff and functional departments“Bao”——Improve the system“Conservative law”、Technical quality“Protect the root”、Take care of the team“Protect the terminal”、Remind often“Keep the status”、Properly respond to emergencies“Keep the bottom line”;It is necessary to solidly carry out the three-year action to tackle the root causes of production safety.,All units should conscientiously enhance their ideological understanding of the action to tackle the root causes.,Taking Strengthening the Foundation as the Theme of Current Work Safety,Systematically plan the fundamental measures for safe production,Strengthen the root cause、See the actual effect,Go all out to carry out the work of the three-year action,Strive to fundamentally eliminate hidden dangers、Solve the problem at the root。

This meeting is based on the scene.+Held in the form of video,Standing Committee of the Party Committee of the Group Company、Deputy general manager in charge of safety、Chief Engineer Hu Bin,Dai Chaoren, the safety director,Person in charge of each unit、Project team leaders and full-time and part-time safety officers attended the meeting.。

Featured

more

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China