Products Center
More Products

Boreton 700kWh Pure Electric Mining Card Expedition Day 115: Attendance Rate 99.78%

March 14, 2024

Inner Mongolia Jindi Mining, a subsidiary of Beijing Jianlong Group, purchased 10 sets in 2023BRT105E-700kWhPure electric mining card,Used for stripping earthwork and ore transportation after blasting,Heavy load uphill mainly。The Vehicle officially started operation on November 20.,2 shifts day and night,As of March 13, 2024,Total operation time: 115 days,The attendance rate is 99.78%。We pass a few key words.,Get to knowBRT105EDetails of the operation of。



99.78%     

During 115 days of operation,Only one Vehicle was stopped for 60 hours due to breakdown.(2.5 days),The rest of the time, all Vehicles are on duty normally.。The total attendance rate of 10 vehicles in 115 days reached 99..78%。The cause of this outage was accidental damage to a component.,It needs to be transported from the regional central warehouse.,It could have been repaired the same day.,However, the transportation process was affected by heavy snow.,Resulting in logistics delays,As a result, downtime was longer than expected。

Wang Shuai, director of after-sales service of Boreton, said.,Boreton has always adhered to“Customer first,Serve with heart”Service concept,Adhere to the service mode of service engineer stationed in the mine,Service parts are reserved in the mining area,Reduce the waiting time for maintenance to a greater extent,In view of the situation of spare parts for maintenance, we will further improve the types of spare parts reserve.,And that maintenance efficiency is improve,Guarantee customer production。

12 million     

The official report of Abaga Banner Bureau of Industry and Information Technology in Inner Mongolia shows that,After Jindi Mining launched the project of green electrification of transport capacity,The cost can be reduced by 4227 yuan per ton of molybdenum powder produced.,The annual cost will be reduced by more than 12 million yuan.。The green production scheme has effectively improved the competitiveness and profitability of enterprises.,And protect the green mountains and rivers.,Promoting high-quality development。

  

700kWh   

For heavy duty uphill condition,Borreton developed the 700kWhPure electric mining card,Meet the needs of continuous heavy load uphill。In order to meet the demand for rapid energy replenishment,,BRT105E-700KWhThe battery system of the pure electric mineral card adopts a four-branch design.,Support simultaneous charging of 4 guns,The charging power can reach 600kW,Make the most of rest、Completing the energy supplement during the shift change,It effectively ensures the operation efficiency of vehicles.。

40-60 minutes  

Thanks to super power charging,The actual charging time at the customer site is mostly distributed at 40-Within 60 minutes,Able to meet ongoing operational needs。Take advantage of the charging gap,Mao Jiyuan, a service engineer stationed in the mine, will also do daily inspection and regular maintenance for the vehicles.,If potential hidden dangers are found, they should be eliminated in time.,Always keep the vehicle in good condition,The meticulous and efficient work has been fully affirmed by customers.。

-34.5℃   

Data released by the Central Meteorological Observatory show that,The lowest temperature in Abaga Banner has reached.-34.5℃,The elevation of the mining area is higher than that of the urban area.,The temperature measured in the field is even lower.。Face the cold wave,Borreton Pure Electric Mine Card withstands the test,Successfully completed the winter production work,,Dispelling customer concerns about electric vehicles。

  

(Screenshot from the website of the Central Meteorological Observatory,December 20, 2023)

Battery temperature management system independently developed by Boreton,And according to the actual situation of each car.,Targeted design layout,So that each battery cell can fully exchange heat with the coolant,So that it is in a suitable temperature range,Improved security and stability。Whether it is heat dissipation during high-power charging and discharging、Or in the winter cold test?,Can deal with it calmly.。

Intelligent early warning   The development of anything is a process in which quantitative change leads to qualitative change.,Many malfunctions have precursors.,But it usually needs to be accumulated to a certain extent before it can be perceived by the naked eye.。Boreton uses intelligent technology to prevent trouble before it happens.,In many cases, the fault can be eliminated before it affects the actual production,Improve the service capability of Boreton,Increased customer satisfaction,And the service cost is reduced,Benefit in many ways。

Borreton is a new force enterprise in the field of new energy construction machinery.,Not just focus on electrification,It also focuses on the driverless field.。In order to ensure the expansibility of driverless vehicles,,At the beginning of its research and development, Borreton adopted a highly intelligent design.,By mean of vehicle sensors and control system,Engineers can monitor anomalies at the outset,Predict the failure in advance,And deal with it in time。

Boreton defines his role as“Green transport service provider“,So not only to provide products for customers,More customer service to provide a full range of integrated services.,Escort green production for users。Borreton believes,Help users reduce costs,To help Boreton succeed.!

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China