Products Center
More Products

Cummins Exploratory Hydrogen Plant | Assembly Workshop High Efficiency, High Precision Equipment Show Process

December 21, 2023

With CumminsAcceleraThe first localization

Proton exchange membrane(PEM)Hydrogen production equipment

Start the hydrogen production test

Localized hydrogen production capacity improved again

This is inseparable from Cummins Enze.

Advanced、Flexibility、Lean

PEMHydrogen production equipment manufacturing plant

In the last issue, everyone appreciated it.【Welding workshop】The charm of

Let's walk into today.【Assembly shop】

Explore the advancedAssembly process

And well-designedProcess equipment

 Planning 4 Assembly line 

The quality of cutting-edge technology is reliable

Cummins Green Hydrogen Manufacturing Plant

4 assembly lines are planned,Two projects have been completed in the first phase

RespectivelyHyLYZER®-500

AndHyLYZER®-1000 special line production

Each module adopts the manufacturing mode of synchronous sub-assembly.

It is a large batch in the later period、Modular

Explore the process of assembly line production

AdoptProduct steel structure、Penstock

Pressure vessel、Instrumentation、All kinds of regulating valves

Electrical control system, etc.Parts assembly process

Ensure reliable product quality

 Big 5 Equipment highlights 

Significant improvement in production efficiency

Adopt32T、10TAnd 2TAnd Vehicles/ 'target='_blank' style='color:blue;'>Other Vehicles of different tonnage

For finished products、Lifting and handling of subassemblies and parts

UseAir flotation equipmentEasily move products to the test room

Avoid damage to the ground

MES(Manufacturing Execution System)Industrial control computer

By scanning the code,MESReal-time automatic recording

Information of key parts in assembly process

AdvancedTighten the tool

Import the digital display tightening wrench with data transmission

And a high-torque battery tightening gun with a counterforce design.

Lifting tightening control capability

Climb Vehicle combined with special clamp

Used for butt joint installation of large components

And that installation efficiency is improve,Reduce ergonomic problems

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China