December 21, 2023
With CumminsAcceleraThe first localization
Proton exchange membrane(PEM)Hydrogen production equipment
Start the hydrogen production test
Localized hydrogen production capacity improved again
This is inseparable from Cummins Enze.
Advanced、Flexibility、Lean
PEMHydrogen production equipment manufacturing plant
In the last issue, everyone appreciated it.【Welding workshop】The charm of
Let's walk into today.【Assembly shop】
Explore the advancedAssembly process
And well-designedProcess equipment
Planning 4 Assembly line
The quality of cutting-edge technology is reliable
Cummins Green Hydrogen Manufacturing Plant
4 assembly lines are planned,Two projects have been completed in the first phase
RespectivelyHyLYZER®-500
AndHyLYZER®-1000 special line production
Each module adopts the manufacturing mode of synchronous sub-assembly.
It is a large batch in the later period、Modular
Explore the process of assembly line production
AdoptProduct steel structure、Penstock
Pressure vessel、Instrumentation、All kinds of regulating valves
Electrical control system, etc.Parts assembly process
Ensure reliable product quality
Big 5 Equipment highlights
Significant improvement in production efficiency
Adopt32T、10TAnd 2TAnd Vehicles/ 'target='_blank' style='color:blue;'>Other Vehicles of different tonnage
For finished products、Lifting and handling of subassemblies and parts
UseAir flotation equipmentEasily move products to the test room
Avoid damage to the ground
MES(Manufacturing Execution System)Industrial control computer
By scanning the code,MESReal-time automatic recording
Information of key parts in assembly process
AdvancedTighten the tool
Import the digital display tightening wrench with data transmission
And a high-torque battery tightening gun with a counterforce design.
Lifting tightening control capability
Climb Vehicle combined with special clamp
Used for butt joint installation of large components
And that installation efficiency is improve,Reduce ergonomic problems
According to the system of rotating chairman of the group,Upon the decision of the Board of Directors,May 16, 2024~During 15 May 2025,Mr. Xiang Wenbo is the Chairman of the Group.。 The chairman of the group is the highest person in charge of the da
May 15,The 2nd Shenzhen International Monitoring Industry Expo and the 2nd Eco-environmental Intelligent Monitoring Innovation Technology Application Exchange were held in Shenzhen Convention and Exhibition Center.,The Expo brings together environmenta
China's strength is upward. May 10,National Development and Reform Commission、 Publicity Department of the CPC Central Committee 、Ministry of Industry and Information Technology、The 8th China Brand Day, co-spons
·· Opening Ceremony of Heli Intelligent Logistics Industrial Park ·· New Quality Drives the Future of Intelligent Chain When Forklifts Meet Artificial Intelligence
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China