December 21, 2023

December 19,Sany Marine Engineering 9 setsRTGSuccessfully shipped to Fujian Ronggang Terminal。This is also a batch of quayside bridges cooperated by Fujian Ronggang and Sany.、Field Bridge、First Equipment Shipment in Portal Project。

This batch of equipment is fully electric.RTG,Rated lifting capacity 40.5 tons,Lifting height 18.35m,Span 23.47m,It is a product specially designed by Sany Marine Engineering for the working conditions of Ronggang Wharf.。The equipment is equipped with automatic deviation correction.、Advanced technologies such as Truck anti-drag and cart anti-collision,And reserve an automation interface,To ensure safe and efficient operation of the equipment。In addition,This batch of equipment all uses SANY electric slings.。
In the design of the project、Final assembly and commissioning stage,Project members overcome difficulties,Ensure that the equipment is shipped on time。At present,The batch quayside container crane and gate seat project cooperated by Sany Marine Engineering and Fujian Ronggang Wharf is also in the stage of intensive assembly and commissioning.,It is expected to ship in January 2024。
On December 12th, Asian Construction Equipment Group Co., Ltd. (abbreviated as ACE Group) Xuchang Production Base hosted a delegation of senior clients from The Republic of Tajikistan for an in-depth facility inspection. Guided by the warm winter sun, th
Despite the biting cold of early January, the spirit of international cooperation remained warm and vibrant. On January 5, 2026, three clients from Cameroon traveled thousands of miles to Henan, China, arriving with high expectations for a visit to Asian
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China