December 21, 2023

December 19,Sany Marine Engineering 9 setsRTGSuccessfully shipped to Fujian Ronggang Terminal。This is also a batch of quayside bridges cooperated by Fujian Ronggang and Sany.、Field Bridge、First Equipment Shipment in Portal Project。

This batch of equipment is fully electric.RTG,Rated lifting capacity 40.5 tons,Lifting height 18.35m,Span 23.47m,It is a product specially designed by Sany Marine Engineering for the working conditions of Ronggang Wharf.。The equipment is equipped with automatic deviation correction.、Advanced technologies such as Truck anti-drag and cart anti-collision,And reserve an automation interface,To ensure safe and efficient operation of the equipment。In addition,This batch of equipment all uses SANY electric slings.。
In the design of the project、Final assembly and commissioning stage,Project members overcome difficulties,Ensure that the equipment is shipped on time。At present,The batch quayside container crane and gate seat project cooperated by Sany Marine Engineering and Fujian Ronggang Wharf is also in the stage of intensive assembly and commissioning.,It is expected to ship in January 2024。
AI Translation Notice: This article was translated from Chinese into English using AI-assisted translation. Original source: http://news.lmjx.net/2023/202312/2023122110080491.shtml. The translation may contain errors, and the original Chinese source should be referred to for accuracy.
April 28, 2026,Cummins Generator Technology(China)Ltd(Hereinafter referred to as:CGTChina)30th anniversary,and the new product launch celebration was grandly opened in Wuxi。Cummins relevant leaders,Some customers、Partners and employee representati
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China