Products Center
More Products

The total investment is 41 billion yuan! Three expressways in Henan recruit investment partners

December 13, 2023

【News from Dahe Finance Cube】December 9,Nanyang Traffic Construction Investment Group issued a tender announcement.,Song County to Neixiang、Three expressways from Fangcheng to Nanzhao and Tongbai to Dengzhou recruit investment partners。

The total investment of the three expressways is 41 billion yuan.,Nanyang Transportation Construction Investment Group intends to select qualified investment partners through public bidding to form a project company.,Be responsible for the investment and construction of the project。

It is understood that,Songxian-Neixiang Expressway is a national expressway network planning.G36 One of the four connecting lines from Nanjing to Luoyang,It belongs to the connecting lineG3613 Section from Luoyang to Neixiang。This project is Nanyang Section of Songxian-Neixiang Expressway.,The starting point of the project is near Tuanyuan Village, Xiaguan Town, Neixiang County,Finally, the Lianhuachi junction of Shanghai-Shaanxi Expressway and Huainei Expressway is interconnected.,Connect with Huainei Expressway,Total length 61.644 kilometers,Design speed 100 km/Hour、Design standard of two-way four-lane,Subgrade mark width: 26m,The proportion of bridge and tunnel is 61.98%。Estimated total amount of project investment 109.2.6 billion yuan,1 per kilometer on average.7.7 billion yuan;Cost of construction and installation works: 81.4.8 billion yuan,74% of total investment.58%,The planned construction period is 42 months。

Shenqiu-Lushi Expressway was released by Henan Provincial People's Government in August 2020.《Planning of expressway network in Henan Province(2021〜2035)》It is one of the major corridors of the newly added national urban agglomeration.。This project is Shenqiu-Lushi Expressway.(Fangcheng-Nanzhao Section),The project starts from Xiaoshidian Town, Fangcheng County, Nanyang City.,After crossing with Erguang Expressway on the east side of Nanzhao County,The terminal is located in Cuizhuang Township, Nanzhao County.,Total length of the route 105.100 kilometers。Adopt the standard construction of two-way four-lane expressway,The roadbed width is 27m and 25m respectively.5 meters,Design speed 120 km/Hours and design speed 80 km/Hour,The ratio of bridge to tunnel is 19.148%。The total investment of the project is estimated to be 128.1.4 billion yuan,Average investment per kilometer 1.2.2 billion yuan。Among them, the cost of construction and installation is 826727..0.08 million yuan,64% of total investment.52%,The planned construction period is 36 months。

The Tongbai-Dengzhou Expressway is《Planning of expressway network in Henan Province(2021-2035)》It is the main component of Huaibin-Neixiang Expressway, one of the 16 east-west transverse corridors.,Is it Shanghai-Shaanxi Expressway?(G40)And Fuyin Expressway(G70)The densification line at the junction of Henan and Hubei provinces。The starting point of the project is located on Shanghai-Shaanxi Expressway at the junction of Nanyang City and Xinyang City.,It ends on the Erguang Expressway in Liuji Town, Dengzhou City,Total length 150.022 kilometers,The design speed of this project is 120 km./Hour,Design standard of two-way four-lane,The roadbed width is 27m.,Bridge scale 17.12%。The estimated investment of the project is 172.6.7 billion yuan,Average cost per kilometer 1.1.5 billion yuan,Of which, engineering construction and installation cost is 114.9.8 billion yuan,66% of total investment.59%,The planned construction period is 36 months。

The scope of this tender is to fully complete Songxian to Neixiang.、Bidding for investment partners of three expressways from Fangcheng to Nanzhao and from Tongbai to Dengzhou,The Tenderer shall sign with the Tenderee on schedule.《Resource co-management agreement》And《Cooperation Agreement》,And set up a project company according to the agreement.,Obtain the franchise of the project in accordance with the law and regulations,Take charge of Songxian to Neixiang in batches、Fangcheng to Nanzhao、Investment and financing of three expressways from Tongbai to Dengzhou、Construction and implementation、Operation management、Debt repayment、The whole process of asset management and project transfer.。
This project only accepts bids from enterprises that have joined the enterprise integrity database in the electronic trading platform of public resources in Nanyang City.,Bidders who have not entered the warehouse shall go through the warehousing formalities in time.。December 9, 09:00 to 29 December 09:00 minutes,After successful registration of the potential bidder,Bidding documents can be downloaded directly from the membership system。Deadline for uploading and submission of electronic bidding documents(Deadline for bid submission)At 9:00 on 29 December。

Qualification requirements of the bidder are attached.:

1.An enterprise as a legal person legally registered within the territory of the People's Republic of China,And exist legally,No business license has been revoked、Bad state such as being ordered to close down or being revoked;

2.The bidder shall have the qualification of Grade I or above for general contracting of highway engineering construction.,Have a valid work safety license;

3.Bidder to provide 2020、2021、Financial report for the year 2022,The financial situation is good,Not in possession of the property、Seizure、Freeze、Bankruptcy or other undesirable state、No major non-performing assets or non-performing investment projects;

4. By the end of 2022, the total assets will be more than 40 billion yuan.,Net assets of more than 20 billion yuan in 2022(The financial report of 2022 shall prevail.);

5.Having no less than 49% of the project capital%(40.1.8 billion yuan)Proof of deposit of funds(The deposit certificate shall be issued by a regular commercial bank.,The date of issuance shall be from the date of publication of the tender announcement.);

6.Bidders have undertaken at least one contract with a value of more than 5 billion yuan since December 1, 2018.(Including 5 billion yuan)Achievements in general contracting or investment and construction of expressway construction(The time of signing the contract shall prevail.,Provision of Letter of Acceptance and Construction(Or investment)Contract,If the contract amount cannot be displayed in the letter of acceptance or the contract,Certificates of the Owner shall be provided);

7.In order to prevent the investment and financing risks in the process of project construction、Duration risk、Quality, safety and other risks,After winning the bid, the bidder shall provide no less than 10 billion yuan.(Including 10 billion yuan)Valid assets of,Jointly establish a joint venture with the tenderee,Co-management of assets,The bidder may withdraw the co-managed assets after the risk of opening to traffic is eliminated after the completion of the project.。(Provide a letter of commitment,Signed by the bid winner and the tenderee after winning the bid《Resource co-management agreement》,《Resource co-management agreement》As《Cooperation Agreement》Conditions precedent to entry into force)。

8.According to the latest credit evaluation results,This project does not accept the credit rating of the Department of Transport of Henan Province or the Ministry of TransportDGrade I construction enterprises sign up for bidding。

9.The Bidder shall be admitted to the Ministry of Transport“National Highway Construction Market Credit Information Management System ”Qualification of Highway Engineering Construction、Directory of Highway Engineering Construction Supervision Qualification Enterprises,And the name and qualification of the bidder are completely consistent with the name and qualification of the corresponding enterprise in the list.(This provision shall apply only in accordance with《Notice on Issuing the List of Qualifications of Enterprises Engaged in Highway Engineering》(Hall Road Word〔2011)Number 114)Request,Highway construction and highway supervision enterprises that the tenderee shall examine and verify the qualifications of bidders through the directory)。

10.According to the treasury[2016]Document No.125,To be included in the discredited person to be executed、List of parties involved in major tax violation cases、Bidders on the list of records of serious violations of law and dishonesty in government procurement,Refuse to participate in the bidding activities of this project。The bidder shall provide a standard credit report.,Credit report should be passed“Credit China”Website download,The generation date of the credit report is within 10 days before the deadline for submitting the bidding documents for this project.。List of records of serious violations of law and dishonesty in government procurement inquired by China Government Procurement Network(Provide the screenshot of the website query results after the tender announcement is issued and affix the official seal.)。

11.In the national enterprise credit information publicity system)Bidders listed in the list of serious illegal and dishonest enterprises,Not allowed to participate in the bidding(Provide the screenshot of the website query results after the tender announcement is issued and affix the official seal.);

12 Consortium bidding is accepted in this tender.。
Participating in the bidding in the form of a consortium,None of the parties to the consortium has tendered in this project in its own name or participated in other consortia.;Independently participating in the bidding,The bidder does not participate in the consortium bidding for the same project at the same time.。

The number of all members of the consortium shall not exceed 5.。Each party of the consortium shall, within the scope of work it undertakes, meet the corresponding qualification requirements of the tenderer for bidders.,The sponsor and members of the consortium shall meet the following condition:
①All parties of the consortium shall meet the requirements of 3.Section 1、3.Section 3、3.10 items、3.11 requirements;
②The consortium leader shall meet the requirements of 3.Section 4、3.Section 5、3.Requirements of Clause 7;
③One of the parties of the consortium meets the requirement of 3.Paragraph 6 Requirements;
④The members of the consortium undertaking the construction task shall meet the requirements of 3.Section 2、3.8 items、3.9 requirements。

13.This project is subject to post-qualification.,The content of the review shall be based on the information of the enterprise integrity database filled in and uploaded before the deadline for bidding.,The overdue changed information of the integrity database shall not be used as the basis for the review of this project.。The original information of the integrity database is not accepted at the bid opening and evaluation site.。The information uploaded by the integrity database must be complete.,Real and effective,The scanned copy of the original is legible。Otherwise,As a result, the score should be scored but not scored or the qualification examination is not qualified.,The responsibility shall be borne by the bidding enterprise。

14.When the bid evaluation results of this project are publicized,At the same time, the information of the integrity database of the successful candidates shall be publicized.,Accept social supervision。

Featured

more

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China