Products Center
More Products

Xizhu Equipment Branch is busy with delivery at the end of the year and goes all out to ensure performance

December 12, 2023

Since December,Orders of CCCC Xizhu Equipment Branch Surge,Multiple sets of large equipment need to be delivered centrally,The whole staff of the branch company has entered the state of working hard.,The cold weather could not resist the enthusiasm of the people who built the equipment in the west.,They are enthusiastic in their respective posts.,Work overtime to catch up with the progress、Guarantee production、Busy with delivery。

The product delivery personnel shuttling in the finished product warehouse area are burning the midnight oil.,Busy hoisting,Busy loading,Busy transportation dispatch,At the same time, the centralized parallel delivery of four sets of equipment is being carried out.。So far,The delivery of equipment branch has entered a small climax.,The daily shipment volume is basically around 15 Vehicles.,There are two sets of products shipped.RModel 3000、A setR5000、A setQ5000 sets,These four sets of hot-selling products are sent out from Xizhu factory at the same time.,Respectively sent to Jiangxi,Henan,Guangdong and other places make efforts for local infrastructure。

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China