November 21, 2023
This newspaper news (Reporter Su Shaojing)“I went back to my hometown a while ago,I found that the road became wide and smooth.,It's more convenient to travel now.。”Mr. Li who works in the city,Referring to the newly completed Haishun Line(Provincial Highway 333)Cross section from Mengcun Haixingjie to Shanshen Line,Praise it。Early this month,The overhaul project was successfully completed and opened to traffic.,The newly repaired road surface is smooth and tidy.,Make driving more comfortable。
The reporter learned from the Municipal Transportation Bureau.,This year, our city invested 2..1.5 billion yuan,Concentrate on the maintenance and upgrading of 26 national and provincial trunk highway pavements。The total length of large and medium-sized repair projects is more than 310 kilometers.,The construction content includes the excavation and repair of old road diseases.、Asphalt concrete surface reinforcement, etc.。At present, all major and medium repair projects have been completed.,The road conditions of the relevant sections have been significantly improved.,Road performance index and road network capacity are further improved.。
These 26 projects include::
●Restoration and Maintenance Project of South Ring Road of Zhenggang Line
●Haishun Line(Provincial Highway 333)Repair and maintenance of the crossing section from Haixingjie to Shanshen Line in Mengcun(Overhaul)Engineering
●Huangyu line(National Highway 337)Repair and maintenance of the crossing section from Hejian West Ring Line to Sulin Line(Medium repair)Engineering
●Jinbao line(Provincial Highway 381)Functional restoration and maintenance of the section from Tianjin to Langfang(Medium repair)Engineering
●Repair and maintenance of the section from the intersection of Taishan Road of Cangde Line to the boundary between Hebei and Shandong(Medium repair)Engineering
●Tianjin-Shantou Expressway Huanghua North Link Preventive Maintenance Project
●Huangyu line(National Highway 337)Repair and maintenance of intersection section from Nandagang connecting line to Shanshen line(Medium repair)Engineering
●Jingping Line(National Highway 104)Prevention and Maintenance Project of the Section from Tianjin to Qingcang
●Binyu Line(National Highway 339)Repair and maintenance of the section from the intersection of Ningwu Branch Line to Beijing-Shanghai Railway Interchange(Medium repair)Engineering
●Huangshan Line(National Highway 307)Repair and maintenance of West Third Ring Road to Cuierzhuang Section(Medium repair)Engineering
●Prevention and Maintenance Project of West Garden Interchange Connection Line of Langcang Expressway
●Jingping Line(National Highway 104)Repair and maintenance of interchange section of Qingcangjie-Baocang Line(Medium repair)Engineering
●Haishun Line(Provincial Highway 333)Repair and maintenance of cross section from Bulaoqiao to Cangle Line(Medium repair)Engineering
●Nanten line(Provincial Highway 384)Repair and maintenance of the section from Nanpai River to the exit of Xidaoan(Medium repair)Engineering
●Repair and maintenance of Lingang connecting line of Shihuang Expressway(Medium repair)Engineering
●Cangle Line(Provincial Highway 283)Repair and maintenance of the section from the intersection of Qianwu Line to Jilu Boundary(Medium repair)Engineering
●Huangshan Line(National Highway 307)Repair and maintenance of the cross section from Huaizhen to Beijing-Guangzhou Railway(Medium repair)Engineering
●North Shugang Interchange—Repair and maintenance of the intersection section from Chemical Avenue to Coastal Expressway of Chemical Avenue Connection Line(Medium repair)Engineering
●North Shugang Interchange—Prevention and Maintenance Project of Coastal Expressway Intersection to Dandong Section of Chemical Avenue Connection Line
●Prevention and Maintenance Project of Gangbei Bridge to Xiaoxinzhuang Section of Nandagang Connection Line of Tianjin-Shantou Expressway
●Repair and maintenance of Hewo connecting line(Medium repair)Engineering
●Repair and maintenance of Huangyin old line(Medium repair)Engineering
●Prevention and Maintenance Project from the Starting Point of Cangzhou West Ring Line of Langcang Expressway to Baocang Line
●Prevention and Maintenance Project of Donghuzhuang-Zhongjie Urban Section of Huangzhao Connection Line of Tianjin-Shantou Expressway
●Huang Xin Line(Provincial Highway 284)Xianzhuang-sea antenna crossing section preventive maintenance project
●Qiantong town—Repair and maintenance of Wuyi branch line(Medium repair)Engineering
December 11, 2024,Dongfeng Commercial Vehicle 2025 Annual Partner Conference Held in Chengdu。Based on the final season of 2024,Dongfeng Commercial Vehicle joins hands with more than 600 dealers nationwide、There are more than 1000 representatives of mor
December eleventh,With“WE ARE ONE——A family、One heart、Work together、It's going to work”The 2025 Global Supply Chain Strategic Partnership Conference of China Heavy Truck Group was held in Shandong International Convention a
The other day,Final judgment of the People's Court of Changsha County, Hunan Province,It was found that Anbaituo Trading Co., Ltd. had caused damage to the commercial reputation of Sunward Intelligence.,Its behavior constitutes unfair competition.
December 2,Beijing Party Branch of International Corporation and Construction Machinery Party Branch of China Construction Machinery Corporation、The General Party Branch of China has launched“Forging New Productive Forces and Promoting New Indust
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China